A footing 10 ft long, 12 in wide and 8 in deep takes about 0.25 cubic yards (6.7 cu ft) of concrete: 13 bags of 80 lb concrete mix with 10% waste. Each 80 lb bag makes about 0.6 cu ft, so a cubic yard is 45 bags. For round post footings, pick Round and enter the tube diameter, depth and number of posts; a 12 in tube 48 in deep takes 6 bags.

Figures based on the sources listed belowUpdated How we calculate

Waste allowance

How thick the concrete is, top to bottom: the pad thickness for a wall footing, or the full hole depth for a pier or post hole.
The bag count and cost range follow the size you pick. High-yield or lightweight mixes make more per bag, so check yours.

Buy 13 bags.

Buy 13 bags

0.25 cu yd + 10% waste = 0.27 cu yd

Low

$58.50

Expected

$78.00

High

$104.00

Includes 0.02 cu yd waste

How this number is calculated

0.25 cu yd + 10% waste = 0.27 cu yd ÷ 0.0222 cu yd per bag = 13 bags

0.3 cu yd — ~3% of a standard truck load

0.3 cu yd — ~3% of a standard truck load

Bagged vs. Ready-mix delivery

Bagged (80 lb bags)

13 bags

$58.50–$104.00 (typ. $78.00)

Ready-mix delivery

0.3 cu yd

$98.02–$114.32 (typ. $104.81)

For ~0.3 cu yd, bagged concrete is usually cheaper and easier for a small pour.

When can I build on it?

Pick the day you pour to see the dates.
  1. Forms off24–48 hours
  2. Build on it (light loads, as your plans allow)7 days
  3. Full design strength28 days

Typical waits for ordinary concrete mix kept moist and above 50 °F (10 °C). They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Follow the bag or your supplier.

Shopping list

  • 80 lb concrete mix bag
  • Mixing tub
  • Finishing trowel
  • Rebar (1/2 inch)
  • Post level
  • Concrete tube form (Sonotube)
Show diagram

Saved projects

No saved projects yet.

80 lb bags per round post footing (Sonotube)

One tube: concrete = π × radius² × depth. Bag counts are the calculator’s: 10% waste, rounded up, at the yields it uses (0.0222 cu yd, about 0.6 cu ft, per 80 lb bag; 0.0167 cu yd, about 0.45 cu ft, per 60 lb bag). The 10 in tubes sit right at a bag boundary: at exactly 0.6 cu ft per bag they take one 80 lb bag fewer (3 and 4). A hole that flares wider than the tube takes more.
Tube diameter × depthConcrete (cu ft)80 lb bags60 lb bags
8 in × 36 in1.0523
8 in × 48 in1.4034
10 in × 36 in1.6444
10 in × 48 in2.1856
12 in × 36 in2.3656
12 in × 48 in3.1468
16 in × 36 in4.19811
16 in × 48 in5.591114

Concrete curing timeline

Typical waits after pouring ordinary concrete mix kept moist and above 50 °F (10 °C), counted in calendar days from the pour day. They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Enter your pour date in the calculator for your own dates.
MilestoneTypical waitExample: poured Sat, Oct 3
Forms off24–48 hoursSun, Oct 4 – Mon, Oct 5
Build on it (light loads, as your plans allow)7 daysSat, Oct 10
Full design strength28 daysSat, Oct 31

Methodology & assumptions

Volume is calculated as footing length × width × (depth in inches ÷ 12), then divided by 27 to convert cubic feet to cubic yards. A waste percentage is added for spillage and over-digging, and the result is divided by the coverage per bag (about 0.0222 cu yd, or 0.6 cu ft, for an 80 lb bag of concrete mix) and rounded up to the next whole bag. For round post footings (Round shape), each footing is π × radius² × depth, times the number of footings; the Sonotube chart above is worked the same way. Bag yields come from the Quikrete Concrete Mix data sheet; lightweight or high-yield mixes make more per bag, so check yours. For long footing runs that push the total past roughly 1 cubic yard, ready-mix delivery is usually more economical than bags. The curing timeline under the calculator uses typical published waits, cited below; they vary with the mix, temperature and curing.

How to calculate how much concrete you need for a footing

  1. Measure the footing. Measure the footing length and width in feet. For a wall footing this runs the length of the wall; for a square pier it is the hole size.
  2. Set the footing depth. Enter the depth (thickness of the concrete) in inches. Check your local code for the required depth in your area.
  3. Choose a waste percentage. Pick 10% standard waste to cover spillage and over-digging, or 5% minimal waste if you are confident in your dimensions.
  4. Divide by bag coverage and round up. Divide the total volume (with waste) by the coverage per bag (about 0.0222 cu yd, or 0.6 cu ft, for an 80 lb bag) and round up to the next whole bag — or switch to ready-mix once you are above roughly 1 cu yd.
  5. For round post footings, use π × r² × depth. For a tube or round hole, pick Round and enter the diameter, depth and number of footings. By hand: multiply π by the radius squared and the depth (in feet), times the number of footings, add 10%, and divide by 0.6 cu ft per 80 lb bag, or read the bag count from the Sonotube chart.

Worked examples

ProjectResult
10 × 1 ft footing, 8 in deep, standard waste0.25 cu yd + 10% waste ≈ 0.27 cu yd → 13 bags
20 × 1.5 ft perimeter footing, 8 in deep, standard waste0.74 cu yd + 10% waste ≈ 0.81 cu yd → 37 bags
6 × 2 ft pier footing, 12 in deep, minimal waste0.44 cu yd + 5% waste ≈ 0.47 cu yd → 22 bags
12 in round tube, 48 in deep3.14 cu ft + 10% waste ≈ 3.46 cu ft → 6 bags of 80 lb
6 fence posts, 8 in tubes 48 in deep8.38 cu ft + 10% waste ≈ 9.22 cu ft → 16 bags of 80 lb

Frequently asked questions

How many bags of concrete do I need for a footing?
Multiply the footing length by its width in feet, multiply by the depth in feet (inches ÷ 12), and divide by 27 to get cubic yards. Add 10% for waste, then divide by about 0.0222 cu yd (0.6 cu ft) per 80 lb bag and round up. A footing 10 ft long, 12 in wide and 8 in deep is 6.7 cu ft (0.25 cu yd), 7.3 cu ft with waste: 13 bags of 80 lb mix.
How many bags of concrete for a round post footing?
Use π × radius² × depth, in feet. A 12 in tube has a 0.5 ft radius, so at 48 in (4 ft) deep it holds 3.14 × 0.25 × 4 = 3.14 cu ft. Add 10% (3.46 cu ft) and divide by 0.6 cu ft per 80 lb bag: 5.8, so 6 bags per post. The chart on this page lists 8, 10, 12 and 16 in tubes at 36 and 48 in deep. In the calculator, pick Round and enter the diameter, depth and number of posts. Entering the diameter as both length and width of a rectangular footing would treat the hole as square, which overestimates by about 27%.
How many 60 lb or 40 lb bags instead of 80 lb?
A 60 lb bag makes about 0.45 cu ft and a 40 lb bag about 0.30 cu ft, versus 0.60 cu ft for 80 lb. So you need about 1.33 times as many 60 lb bags, or twice as many 40 lb bags. Work from the cubic feet with waste, not the rounded 80 lb count: the 10 ft × 12 in × 8 in footing (7.3 cu ft with waste) takes 13 bags of 80 lb, 17 bags of 60 lb or 25 bags of 40 lb. The round post chart has a 60 lb column, and the Bag size picker in the calculator switches the count.
How many bags of concrete are in a cubic yard?
A cubic yard is 27 cu ft, so it takes about 45 bags of 80 lb concrete mix (0.6 cu ft each), 60 bags of 60 lb (0.45 cu ft) or 90 bags of 40 lb (0.30 cu ft), before waste.
How deep should a footing be?
Footings have two depths: how thick the concrete is, and how far below grade the bottom sits. The bottom must sit below your local frost line, which your building department sets; it is shallow in warm climates and can be 4 ft or more in the coldest parts of the US. A continuous wall footing is a concrete pad, often 8 to 12 in thick, at the bottom of the trench, and that thickness is what you enter here. A round post footing is usually poured the full depth of the hole, which is why the chart uses 36 and 48 in. This calculator starts at 8 in as an example, not a code recommendation, so check your local code before you dig.
Should I use ready-mix instead of bags for a large footing?
Once a pour needs more than about 1 cu yd of concrete (about 45 bags of 80 lb mix), a ready-mix truck or a local mini-mix delivery is usually cheaper per yard and far less labor than mixing dozens of bags by hand. Long runs of continuous footing, like a full foundation perimeter, are good candidates for ready-mix even if a single post footing is not.
Do I need rebar in a footing?
Most footings that carry structural load (deck posts, fence posts, foundation walls) benefit from at least one or two lengths of rebar run through the pour for tensile strength, and local code may require it. This calculator estimates concrete volume only — it does not size rebar for you.
When can I take the forms off?
For a footing: forms typically come off after 24 to 48 hours in mild weather (Sun, Oct 4 – Mon, Oct 5 for a Sat, Oct 3 pour), once the concrete holds its shape and the edges no longer crumble; leave them on longer in cold weather. Keep a new wall braced, and put loads or backfill against it only as your plans or inspector allow, usually not before about 7 days. Full design strength comes at about 28 days.
How long does concrete take to cure?
For a footing: concrete sets in hours but keeps curing, gaining strength, for weeks. Typical planning figures: 24–48 hours for forms off, about 7 days before normal use or loads, and full design strength at 28 days. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5, Sat, Oct 10 and Sat, Oct 31; it keeps hardening slowly after that. Keep it moist for at least the first 7 days (mist it, or cover it with plastic or a curing compound) and protect it from freezing: moisture and warmth are what let it reach its strength. Below about 50 °F (10 °C) curing slows, so plan on more days.

Guides