Concrete Slab Calculator
To pour a 10 × 10 ft slab at 4 inches thick you need about 1.23 cubic yards of concrete plus 10% waste — roughly 62 bags of 80 lb mix.
Figures based on the sources listed belowUpdated How we calculate
Buy 62 bags.
Buy 62 bags
1.23 cu yd + 10% waste = 1.36 cu yd
Low
$279.00
Expected
$372.00
High
$496.00
Includes 0.12 cu yd waste
How this number is calculated
1.23 cu yd + 10% waste = 1.36 cu yd ÷ 0.0222 cu yd per bag = 62 bags
Next step in your project
- Gravel Calculator
A compacted gravel base under the slab. Opens with your 10 × 10 ft filled in.
1.4 cu yd — ~14% of a standard truck load
Bagged vs. Ready-mix delivery
Bagged (80 lb bags)
62 bags
$279.00–$496.00 (typ. $372.00)
Ready-mix delivery
1.4 cu yd
$190.12–$271.60 (typ. $224.07)
For ~1.4 cu yd, ready-mix delivery is usually cheaper and far less labor.
When can I walk / drive on it?
- Forms off, light foot traffic24–48 hours
- Normal foot traffic and furniture7 days
- Cars (garage floor, parking pad)7–10 days
- Heavy loads, full design strength28 days
Typical waits for ordinary concrete mix kept moist and above 50 °F (10 °C). They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Follow the bag or your supplier.
Shopping list
- 80 lb concrete mix
- Mixing tub
- Finishing trowel
- Rebar
- Concrete sealer
- Concrete edger
Your project
- Slab length × slab width: 10 × 10 ft
- Thickness: 4 in
- Waste: Standard (10%)
Also pick up
- 80 lb concrete mix
- Mixing tub
- Finishing trowel
- Rebar
- Concrete sealer
- Concrete edger
Reopen this calculation: /calculators/concrete-slab/?s=eyJyb29tIjp7Imxlbmd0aEZ0IjoxMCwid2lkdGhGdCI6MTB9LCJkZWR1Y3Rpb25zIjpbXSwid2FzdGVQY3QiOjAuMSwicGFyYW1zIjp7InRoaWNrbmVzc0luY2hlcyI6NH19
Show diagram
Saved projects
No saved projects yet.
Concrete curing timeline
| Milestone | Typical wait | Example: poured Sat, Oct 3 |
|---|---|---|
| Forms off, light foot traffic | 24–48 hours | Sun, Oct 4 – Mon, Oct 5 |
| Normal foot traffic and furniture | 7 days | Sat, Oct 10 |
| Cars (garage floor, parking pad) | 7–10 days | Sat, Oct 10 – Tue, Oct 13 |
| Heavy loads, full design strength | 28 days | Sat, Oct 31 |
Methodology & assumptions
Volume is calculated as slab length × width × (thickness in inches ÷ 12), then divided by 27 to convert cubic feet to cubic yards. A waste percentage is added for spillage and uneven subgrade, and the result is divided by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and rounded up to the next whole bag. Ready-mix delivery typically becomes more economical than bags once a pour exceeds roughly 1 cubic yard. The curing timeline under the calculator uses typical published waits, cited below; they vary with the mix, temperature and curing.
- Manufacturer bag-yield specs (80 lb ≈ 0.60 cu ft)
- Typical US ready-mix and bag price ranges, 2026
- American Concrete Institute, ACI 308R guide to curing concrete: keep concrete moist for at least the first 7 days (ordinary portland cement mixes)
- Portland Cement Association, Design and Control of Concrete Mixtures: moisture and temperature drive strength gain, which slows in cold weather; design strength is commonly specified at 28 days
- Concrete Network, How Long Before You Can Drive on New Concrete?
How to calculate how much concrete you need for a slab
- Measure your slab area. Measure the length and width of the slab in feet to find its footprint.
- Set the slab thickness. Enter the slab thickness in inches — 4 inches is standard for a floor or shed slab, thicker for heavier loads.
- Add waste. Add 10% for a standard pour, or 5% if you are confident in your forms and mix estimate.
- Divide by bag coverage and round up. Divide the total volume (with waste) by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and round up to the next whole bag.
Worked examples
| Project | Result |
|---|---|
| 10 × 10 ft slab, 4 in thick, standard waste | 1.23 cu yd + 10% waste ≈ 1.36 cu yd → 62 bags |
| 12 × 14 ft floor slab, 4 in thick, standard waste | 2.07 cu yd + 10% waste ≈ 2.28 cu yd → 103 bags |
| 8 × 10 ft shed slab, 4 in thick, minimal waste | 0.99 cu yd + 5% waste ≈ 1.04 cu yd → 47 bags |
Frequently asked questions
- How much concrete do I need for a slab?
- Multiply the slab length by width in feet, multiply by the thickness in feet (inches divided by 12), then divide by 27 to convert cubic feet to cubic yards. Add 10% for waste, then divide by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and round up.
- How many bags of concrete are in a cubic yard?
- About 45 bags of 80 lb mix per cubic yard, since each bag yields roughly 0.60 cu ft and a cubic yard is 27 cu ft. A 60 lb bag yields about 0.45 cu ft (around 60 bags per cubic yard), and a 40 lb bag yields about 0.30 cu ft (around 90 bags per cubic yard). For a slab, that means a 10 ft by 10 ft slab 4 in thick (33.3 cu ft, about 1.2 cu yd) needs roughly 56 bags of 80 lb mix before waste.
- Is it cheaper to buy bagged concrete or order ready-mix?
- For small pours under about 1 cubic yard, bagged mix is usually more convenient and cost-competitive. Above roughly 1 cubic yard, ready-mix delivered by truck is typically cheaper per yard and far less labor — mixing 45+ bags by hand adds up fast.
- How thick should a concrete slab be?
- A standard interior floor or shed slab is typically 4 inches thick. This calculator defaults to 4 inches, but you can adjust the thickness field for a specific project — thicker slabs (5-6 in.) are used where heavier loads are expected.
- Should I round up or down when figuring out how many bags to buy?
- Always round up to a full bag. Running short mid-pour is a serious problem with concrete since it starts setting once mixed — cold joints from a delayed second batch weaken the slab. For a 10 ft by 10 ft slab 4 in thick, 36.7 cu ft with 10% waste is 61.1 bags of 80 lb mix, so buy 62.
- How long before you can walk on concrete?
- For a slab: typically 24 to 48 hours for light foot traffic, once the surface is hard enough not to scuff; edge forms usually come off around the same time. Wait about 7 days before normal traffic, furniture or a loaded wheelbarrow. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5 for light foot traffic and Sat, Oct 10 for normal use. These are typical figures for ordinary concrete mix kept moist and above 50 °F (10 °C); cold weather slows curing and adds days, so follow the bag or your supplier.
- How long before you can drive on a new driveway?
- For a slab: typically 7 to 10 days for cars and pickups, and about 28 days for heavy vehicles such as an RV, a delivery truck or a loaded dumpster. Concrete is commonly around 70% of its design strength after 7 days and reaches it at about 28 days, the age design strength is specified at. Keep wheels off the edges, which are weakest, and add days in cold weather (below about 50 °F or 10 °C). Poured on Sat, Oct 3? Cars: Sat, Oct 10 – Tue, Oct 13; heavy vehicles: Sat, Oct 31.
- How long does concrete take to cure?
- For a slab: concrete sets in hours but keeps curing, gaining strength, for weeks. Typical planning figures: 24–48 hours for light foot traffic, about 7 days before normal use or loads, and full design strength at 28 days. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5, Sat, Oct 10 and Sat, Oct 31; it keeps hardening slowly after that. Keep it moist for at least the first 7 days (mist it, or cover it with plastic or a curing compound) and protect it from freezing: moisture and warmth are what let it reach its strength. Below about 50 °F (10 °C) curing slows, so plan on more days.