Concrete Mix Ratio Calculator: Cement, Sand, Gravel and Water

A 10 × 10 ft slab 4 in thick (1.24 cu yd, or 1.36 cu yd with 10% waste) mixed 1:2:3 needs 10 bags of 94 lb cement (about 9.4 cu ft), 18.8 cu ft of sand, 28.2 cu ft of gravel and about 53 gallons of water at a water-cement ratio of 0.5. The same job in 80 lb pre-mix bags is 62 bags. The dry parts add up to about 1.54 times the mixed volume (a typical estimate), because the sand fills the gaps between the gravel and the cement fills the gaps in the sand.

Figures based on the sources listed belowUpdated How we calculate

Waste allowance
1:2:3 and 1:2:4 are common general-purpose concrete mixes; 1:3, 1:4 and 1:6 are cement and sand mortars, richest to leanest. They are volume ratios of loose materials, not a structural mix design.

How thick the concrete or mortar is. Ignored when you type a volume below.

Leave at 0 to use length × width × depth. A value above 0 replaces them, for a shape worked out elsewhere. One cu yd is 27 cu ft.

Weight of water to weight of cement. 0.45 to 0.6 is a typical range for site-mixed concrete: lower is stronger and stiffer. Wet sand brings its own water, so start low and add. Mortar is mixed to a workable consistency by feel and often takes more.
The US bag is 94 lb and holds about 1 cu ft. A 50 kg bag is about 110 lb.

Loose dry materials needed per 1 of mixed volume. Leave empty for the typical figure: about 1.54 for concrete and 1.30 for mortar (estimates; 1.27 to 1.33 is quoted for mortar).

Buy 10 bags.

Buy 10 bags

1.23 cu yd + 10% waste = 1.36 cu yd

  • Sand: 18.8 cu ft (≈ 0.94 tons)
  • Gravel: 28.2 cu ft (≈ 1.46 tons)
  • Water (at the water-cement ratio): 53 gal
  • Sand and gravel by the yard: 1.74 cu yd
  • Pre-mix instead (80 lb bags): 62 bags (≈ 4,960 lb)

Low

$120.00

Expected

$160.00

High

$220.00

Includes 0.12 cu yd waste

How this number is calculated

1.23 cu yd + 10% waste = 1.36 cu yd ÷ 0.144 cu yd per bag = 10 bags

1.4 cu yd — ~14% of a standard truck load

1.4 cu yd — ~14% of a standard truck load

Bagged vs. Ready-mix delivery

Bagged (80 lb bags)

62 bags

$279.00–$496.00 (typ. $372.00)

Ready-mix delivery

1.4 cu yd

$190.12–$271.60 (typ. $224.07)

For ~1.4 cu yd, ready-mix delivery is usually cheaper and far less labor.

Shopping list

  • 94 lb Portland cement
  • Mixing tub
  • Portable concrete mixer
  • Contractor wheelbarrow
  • Mixing hoe
  • Finishing trowel
Show diagram

Saved projects

No saved projects yet.

Materials per cubic yard by mix

One cu yd (27 cu ft) of mixed material, no waste, 94 lb bags, water at a ratio of 0.5, worked by this calculator with the typical dry-volume factors (1.54 concrete, 1.3 mortar, estimates). Quantities in cu ft except the last column.
MixCement (cu ft)Sand (cu ft)Gravel (cu ft)Water (gal)Loose dry volume (cu yd)
1:2:3 concrete6.9 (7 bags)13.920.839.11.54
1:2:4 concrete5.9 (6 bags)11.923.833.51.54
1:3 mortar8.8 (9 bags)26.3none49.51.3
1:4 mortar7 (8 bags)28.1none39.61.3
1:6 mortar5 (6 bags)30.1none28.31.3

1:2:3 concrete for common pour sizes

Mixed volume with 10% waste, water at a ratio of 0.5, worked by this calculator. The last column is the same pour in 80 lb pre-mix bags at about 0.60 cu ft each.
Pour94 lb cement bagsSand (cu ft)Gravel (cu ft)Water (gal)80 lb pre-mix bags
3 cu ft11.72.54.86
5 cu ft22.84.2810
10 cu ft35.68.515.919
20 cu ft611.316.931.837
27 cu ft815.222.94350
54 cu ft1630.545.785.9100

Water per bag of cement

Water = ratio × cement weight. A 94 lb bag, and a 50 kg bag in litres (1 litre of water weighs 1 kg). Damp sand already holds some of this.
Water-cement ratioGallons per 94 lb bagLitres per 50 kg bag
0.404.520
0.455.122.5
0.505.625
0.556.227.5
0.606.830

Methodology & assumptions

The mixed (wet) volume is length × width × depth, or the volume you type, plus the waste you pick. The dry volume of loose materials is that volume × the dry-volume factor: about 1.54 for concrete and about 1.3 for mortar. These are typical estimating figures, not code values (1.27 to 1.33 is quoted for mortar, and 1.52 to 1.57 for concrete), and the box lets you enter your own. The dry volume is shared out by the mix parts: for 1:2:3 the parts total 6, so cement is 1/6, sand 2/6 and gravel 3/6 of it. Cement bags are the cement volume ÷ the bag volume (a 94 lb US bag is taken as 1 cu ft; a 50 kg bag is about 110 lb, so about 1.17 cu ft), rounded up. Water is the water-cement ratio × the cement weight (94 lb per cu ft), divided by 8.34 lb per US gallon. Sand and gravel tons use the site’s planning densities, 1.35 and 1.4 tons per cu yd. Real sand and gravel vary with moisture and grading: wet sand bulks up and carries its own water, so measure a trial batch and adjust. These are volume ratios for small jobs; structural work needs a proper mix design.

How to work out cement, sand, gravel and water for a concrete mix

  1. Find the volume. Multiply length × width × depth in feet (depth in inches ÷ 12) for cubic feet, then add 5 to 10% for waste. Or type the volume if you already have it. 27 cu ft make 1 cu yd.
  2. Pick the mix. 1:2:3 is the usual general-purpose concrete, 1:2:4 is leaner. For mortar use 1:3, 1:4 or 1:6 cement to sand.
  3. Convert to dry volume. Multiply the mixed volume by the dry-volume factor, about 1.54 for concrete and 1.3 for mortar (typical estimates).
  4. Share it out by the parts. Divide the dry volume by the sum of the parts (6 for 1:2:3) and multiply by each part. That gives cement, sand and gravel in cubic feet.
  5. Turn it into bags and water. Divide the cement by 1 cu ft per 94 lb bag and round up. Water in gallons = water-cement ratio × cement pounds ÷ 8.34. Compare with pre-mix bags before you buy.

Worked examples

ProjectResult
10 × 10 ft slab, 4 in thick, 1:2:3, 94 lb cement bags, 10% waste10 bags of cement, 18.8 cu ft sand, 28.2 cu ft gravel, 53 gal water (versus 62 pre-mix bags)
12 × 12 ft patio, 4 in thick, 1:2:4, 10% waste12 bags of cement, 23.2 cu ft sand, 46.5 cu ft gravel
5 cu ft of 1:4 mortar (typed volume), 10% waste2 bags of cement, 5.7 cu ft sand, 8.1 gal water
10 × 10 ft slab, 4 in thick, 1:2:3 with 50 kg cement bags9 bags of cement (50 kg), the same sand and gravel

Frequently asked questions

What does a 1:2:3 concrete mix mean?
One part cement, two parts sand and three parts gravel (coarse aggregate), measured by volume with the same bucket or box. Quikrete’s Portland cement data sheet gives it as the proportion for concrete from bagged cement, sand and gravel. A 1:2:4 mix has one more part of gravel: a little leaner, cheaper and easier to place, and somewhat weaker.
How much cement, sand and gravel for 1 cubic yard of concrete?
At the typical dry-volume factor of 1.54, a cubic yard of 1:2:3 takes 6.9 cu ft of cement (7 bags of 94 lb), 13.9 cu ft of sand and 20.8 cu ft of gravel, plus about 39.1 gallons of water at a ratio of 0.5. A cubic yard of 1:2:4 takes 5.9 cu ft of cement (6 bags), 11.9 cu ft of sand and 23.8 cu ft of gravel. Add waste on top.
What is the dry-volume factor, and why 1.54?
Loose sand, gravel and cement take up more room than the concrete they make: the cement and sand fill the gaps between the gravel particles, and water and compaction close the rest. Estimators therefore multiply the wet (finished) volume by a factor to get the dry volume of materials to batch. About 1.54 is the usual figure for concrete and 1.27 to 1.33 for mortar, so the calculator uses 1.3 for mortar. These are typical estimates, not code values; the real figure shifts with grading, moisture and how loosely the materials are measured. If your trial batches come out short or long, enter your own factor.
What water-cement ratio should I use?
The water-cement ratio is the weight of water divided by the weight of cement. Lower ratios give stronger, less permeable concrete, but a stiffer mix that is harder to place. Around 0.45 to 0.6 is a typical range for site-mixed concrete, with 0.5 a common starting point. The Portland Cement Association’s Design and Control of Concrete Mixtures sets lower maximums for concrete exposed to freezing and thawing or de-icing salts, so use a lower ratio and a proper mix design there. Add water a little at a time: sand that is already damp needs less than the calculator shows.
How many gallons of water per bag of cement?
Water per bag = ratio × 94 lb ÷ 8.34 lb per gallon. At 0.45 that is 5.1 gallons per 94 lb bag, at 0.5 it is 5.6 and at 0.6 it is 6.8. For a 50 kg bag, multiply the ratio by 50 to get litres. The water table on this page has the rows in between.
Why does Quikrete say 5 to 6 bags per cubic yard when this shows more?
Quikrete’s data sheet gives a yield of roughly five to six 94 lb bags of Portland cement per cubic yard, depending on the proportions and materials used. At the typical dry-volume factor, 1:2:3 comes to 6.9 bags per cubic yard and 1:2:4 to 5.9, at or above the top of that range, so the tool errs towards enough cement. The sheet’s range depends on the sand and gravel used, and the factor is only a typical figure: if your trial batches yield more per bag, enter a lower dry-volume factor to match, and treat the result as an estimate to confirm with a trial batch.
What mortar mix ratio should I use?
Cement and sand mortars by volume run from 1:3 (rich, strong, sticky) through 1:4 to 1:6 (lean, workable, weaker). Lean mixes suit rendering and non-structural bedding; richer ones suit paving bedding and repairs. ASTM C270 sets mortar for unit masonry by type, in cement, lime and sand proportions, with sand about 2 1/4 to 3 times the volume of the cementitious materials, so for load-bearing brick and block follow the mortar type your plans call for rather than a plain cement and sand ratio. For 5 cu ft of mortar at 1:4 with 10% waste, this calculator gives 2 bags of cement and 5.7 cu ft of sand.
Is it cheaper to mix my own concrete or buy pre-mix bags?
For small pours, bags are less work and nothing is left over: 62 bags of 80 lb mix for the 10 × 10 ft slab, against 10 bags of cement plus 18.8 cu ft of sand and 28.2 cu ft of gravel to buy, haul and measure. Mixing your own starts to pay when you need a lot of concrete, you can buy sand and gravel in bulk, and you have a mixer or the help to batch it. Past about a cubic yard, ready-mix delivery usually beats both. See the concrete bag calculator for the bag count, with 60 and 40 lb sizes.
Can I use a 50 kg bag of cement?
Yes: pick it under Cement bag. A 50 kg bag weighs about 110 lb, so at the same density it holds about 1.17 cu ft instead of 1. The 1:2:3 slab then needs 9 bags instead of 10, and the sand, gravel and water are unchanged.
Is a volume mix strong enough for a slab or footing?
A 1:2:3 mix is a classic general-purpose proportion, but a volume ratio does not control strength by itself: the water-cement ratio, the grading and cleanliness of the sand and gravel, and curing all matter, and the result varies from batch to batch. For driveways, footings, structural elements or anywhere your building department requires a strength, use ready-mix or a bagged mix with a stated strength, and follow your local code and engineer.