How Many Bags of Concrete Do I Need?
For a 10 × 10 ft slab at 4 in thick (the default thickness) you need about 1.23 cu yd of concrete plus 10% waste — roughly 62 bags of 80 lb concrete mix. Buying 60 lb or 40 lb bags? Pick the size in the calculator and the count follows. Setting fence posts? Pick Round and enter the hole size and the number of holes.
Figures based on the sources listed belowUpdated How we calculate
Buy 62 bags.
Buy 62 bags
1.23 cu yd + 10% waste = 1.36 cu yd
Low
$279.00
Expected
$372.00
High
$496.00
Includes 0.12 cu yd waste
How this number is calculated
1.23 cu yd + 10% waste = 1.36 cu yd ÷ 0.0222 cu yd per bag = 62 bags
1.4 cu yd — ~14% of a standard truck load
Bagged vs. Ready-mix delivery
Bagged (80 lb bags)
62 bags
$279.00–$496.00 (typ. $372.00)
Ready-mix delivery
1.4 cu yd
$190.12–$271.60 (typ. $224.07)
For ~1.4 cu yd, ready-mix delivery is usually cheaper and far less labor.
When can I walk on it?
- Forms off, light foot traffic24–48 hours
- Normal foot traffic and furniture7 days
- Full design strength28 days
Typical waits for ordinary concrete mix kept moist and above 50 °F (10 °C). They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Follow the bag or your supplier.
Shopping list
- 80 lb concrete mix bag
- 60 lb concrete mix bag
- Mixing tub
- Finishing trowel
- Wheelbarrow
- Portable concrete mixer
Your project
- Length × width: 10 × 10 ft
- Shape: Rectangular (slab, pad, square hole)
- Thickness (depth): 4 in
- Bag size: 80 lb (0.60 cu ft)
- Waste: Standard (10%)
Also pick up
- 80 lb concrete mix bag
- 60 lb concrete mix bag
- Mixing tub
- Finishing trowel
- Wheelbarrow
- Portable concrete mixer
Reopen this calculation: /calculators/concrete-bags/?s=eyJyb29tIjp7Imxlbmd0aEZ0IjoxMCwid2lkdGhGdCI6MTB9LCJkZWR1Y3Rpb25zIjpbXSwid2FzdGVQY3QiOjAuMSwicGFyYW1zIjp7InNoYXBlIjowLCJkaWFtZXRlckluIjoxMCwiY291bnQiOjEsInRoaWNrbmVzc0luY2hlcyI6NCwiYmFnTGIiOjgwfX0
Show diagram
Saved projects
No saved projects yet.
80 lb bags per fence post hole
| Wood post | Hole (diameter × depth) | Concrete per hole (cu ft) | 80 lb bags, 1 hole | 80 lb bags, 10 holes |
|---|---|---|---|---|
| 4 × 4 | 10 × 30 in | 1.36 | 3 | 26 |
| 4 × 4 | 12 × 24 in | 1.57 | 3 | 29 |
| 4 × 4 | 12 × 36 in | 2.36 | 5 | 44 |
| 6 × 6 | 18 × 36 in | 5.30 | 10 | 98 |
| 6 × 6 | 18 × 48 in | 7.07 | 13 | 130 |
Concrete curing timeline
| Milestone | Typical wait | Example: poured Sat, Oct 3 |
|---|---|---|
| Forms off, light foot traffic | 24–48 hours | Sun, Oct 4 – Mon, Oct 5 |
| Normal foot traffic and furniture | 7 days | Sat, Oct 10 |
| Full design strength | 28 days | Sat, Oct 31 |
Methodology & assumptions
Volume is calculated as length × width × (thickness in inches ÷ 12), then divided by 27 to convert cubic feet to cubic yards. A waste percentage is added for spillage and over-excavation, and the result is divided by the coverage per bag (about 0.0222 cu yd for an 80 lb bag, 0.0167 for 60 lb and 0.0111 for 40 lb) and rounded up to the next whole bag. For post holes (Round shape), each hole is π × radius² × depth, times the number of holes, and the whole job is rounded up once. The post itself is not subtracted, which leaves a small margin. Ready-mix delivery typically becomes the more economical option once a pour exceeds roughly 1 cubic yard. The curing timeline under the calculator uses typical published waits, cited below; they vary with the mix, temperature and curing.
- Quikrete Concrete Mix (No. 1101) data sheet: 80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft, 40 lb ≈ 0.30 cu ft
- Quikrete, Setting Posts in Concrete: a hole about 3 times the post width, 1/3 to 1/2 of the post height above ground deep
- Typical US ready-mix and bag price ranges, 2026
- American Concrete Institute, ACI 308R guide to curing concrete: keep concrete moist for at least the first 7 days (ordinary portland cement mixes)
- Portland Cement Association, Design and Control of Concrete Mixtures: moisture and temperature drive strength gain, which slows in cold weather; design strength is commonly specified at 28 days
- Concrete Network, How Long Before You Can Drive on New Concrete?
How to calculate how many bags of concrete you need
- Measure the length and width. Measure the length and width of the slab, pad, or area you are pouring, in feet.
- Set the thickness. Enter the pour thickness in inches — 4 in is a common default for a walkway or patio slab.
- Choose a waste percentage. Pick 10% standard waste for most pours, or 5% minimal waste if your base is well-prepared and measurements are precise.
- Divide by bag coverage and round up. Divide the total volume (with waste) by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and round up. Using 40 lb or 60 lb bags instead? Pick that size in the calculator, or divide by its yield (0.011 or 0.0167 cu yd).
- For post holes, use π × r² × depth. For fence posts or tube forms, pick Round and enter the hole diameter, the depth of concrete and the number of holes. By hand: π × radius² × depth in feet for each hole, times the number of holes, plus waste, divided by the bag yield.
Worked examples
| Project | Result |
|---|---|
| 10 × 10 ft slab, 4 in thick, standard waste | 1.23 cu yd + 10% waste ≈ 1.36 cu yd → 62 bags |
| 4 × 4 ft fence post pad, 4 in thick, minimal waste | 0.20 cu yd + 5% waste ≈ 0.21 cu yd → 10 bags |
| 12 × 12 ft patio, 4 in thick, standard waste | 1.78 cu yd + 10% waste ≈ 1.96 cu yd → 89 bags |
| 10 fence posts, 12 in holes 36 in deep | 23.56 cu ft + 10% waste ≈ 25.92 cu ft → 44 bags of 80 lb |
Frequently asked questions
- How many bags of concrete do I need?
- Multiply the length by the width in feet, multiply by the slab or pad thickness (converted from inches to feet), and divide by 27 to get cubic yards. Add waste, then divide by the coverage per bag and round up.
- How much concrete is in a 40 lb, 60 lb, or 80 lb bag?
- A 40 lb bag yields about 0.011 cu yd (0.30 cu ft), a 60 lb bag about 0.0167 cu yd (0.45 cu ft), and an 80 lb bag about 0.0222 cu yd (0.60 cu ft) of mixed concrete. The calculator starts at 80 lb bags; pick 60 lb or 40 lb under Bag size and the count and cost follow. You need more of the smaller bags for the same volume: about 1.33 times as many 60 lb bags, or twice as many 40 lb bags. To convert any bag size to or from cubic yards, use the cubic yards to bags converter.
- How many bags of concrete for a fence post?
- Usually 2 to 5 bags of 80 lb mix per post for a 4 × 4, more for a 6 × 6. A common rule is a hole about 3 times the post width and 1/3 to 1/2 as deep as the post stands above ground, so a 4 × 4 on a 6 ft fence gets a 10 to 12 in hole at least 24 in deep (deeper where your frost line requires). A 12 in hole 36 in deep holds π × 0.5² × 3 = 2.36 cu ft; with 10% waste that is 2.59 cu ft, or 5 bags of 80 lb mix at about 0.6 cu ft each. In the calculator, pick Round and enter the diameter, the depth and the number of holes; the table above lists common sizes. Enter all the posts at once: the job is rounded up once, not per hole.
- How much extra should I buy for waste?
- Budget 10% extra (standard) to cover spillage, uneven subgrade, and over-excavation. Drop to 5% (minimal) only if you are confident in your measurements and pouring on a well-prepared, level base.
- When should I use ready-mix instead of bags?
- Once a pour needs more than about 1 cu yd of concrete, a ready-mix truck or local mini-mix delivery is usually cheaper per yard and dramatically less labor than mixing dozens of bags by hand. Bags make the most sense for small slabs, pads, post holes, and repairs under that threshold.
- What thickness should I use for a slab or pad?
- A typical walkway or patio slab runs 4 in thick; a driveway or anything that will see vehicle loads is usually poured thicker (5-6 in or more) with reinforcement. This calculator defaults to 4 in as a common baseline — check your local code and intended use before finalizing.
- How long before you can walk on concrete?
- For a bagged-mix pour: typically 24 to 48 hours for light foot traffic, once the surface is hard enough not to scuff; edge forms usually come off around the same time. Wait about 7 days before normal traffic, furniture or a loaded wheelbarrow. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5 for light foot traffic and Sat, Oct 10 for normal use. These are typical figures for ordinary concrete mix kept moist and above 50 °F (10 °C); cold weather slows curing and adds days, so follow the bag or your supplier.
- How long does concrete take to cure?
- For a bagged-mix pour: concrete sets in hours but keeps curing, gaining strength, for weeks. Typical planning figures: 24–48 hours for light foot traffic, about 7 days before normal use or loads, and full design strength at 28 days. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5, Sat, Oct 10 and Sat, Oct 31; it keeps hardening slowly after that. Keep it moist for at least the first 7 days (mist it, or cover it with plastic or a curing compound) and protect it from freezing: moisture and warmth are what let it reach its strength. Below about 50 °F (10 °C) curing slows, so plan on more days.
Guides
Handy tools
- Cubic Yards to Bags: Turn cubic yards of concrete into a count of 40, 60 or 80 lb bags.