Concrete Wall Calculator

To pour a 10 ft long × 4 ft tall wall at 8 in thick (the default wall thickness) you need about 0.99 cu yd of concrete plus 10% waste — roughly 49 bags of 80 lb concrete mix. Enter the wall length and height as the two dimensions, and set thickness to the wall thickness; above about 1 cu yd, ready-mix delivery is usually cheaper and faster than bags.

Figures based on the sources listed belowUpdated How we calculate

Waste allowance

Buy 49 bags.

Buy 49 bags

0.99 cu yd + 10% waste = 1.09 cu yd

Low

$220.50

Expected

$294.00

High

$392.00

Includes 0.10 cu yd waste

How this number is calculated

0.99 cu yd + 10% waste = 1.09 cu yd ÷ 0.0222 cu yd per bag = 49 bags

1.1 cu yd — ~11% of a standard truck load

1.1 cu yd — ~11% of a standard truck load

Bagged vs. Ready-mix delivery

Bagged (80 lb bags)

49 bags

$220.50–$392.00 (typ. $294.00)

Ready-mix delivery

1.1 cu yd

$152.10–$217.28 (typ. $179.26)

For ~1.1 cu yd, ready-mix delivery is usually cheaper and far less labor.

When can the forms come off?

Pick the day you pour to see the dates.
  1. Forms off (keep it braced)24–48 hours
  2. Backfill or loads (as your plans allow)7 days
  3. Full design strength28 days

Typical waits for ordinary concrete mix kept moist and above 50 °F (10 °C). They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Follow the bag or your supplier.

Shopping list

  • 80 lb concrete mix bag
  • Mixing tub
  • Masonry finishing trowel
  • Rebar (1/2 inch)
  • Concrete wall form panels
  • 4 ft level
Show diagram

Saved projects

No saved projects yet.

Concrete curing timeline

Typical waits after pouring ordinary concrete mix kept moist and above 50 °F (10 °C), counted in calendar days from the pour day. They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Enter your pour date in the calculator for your own dates.
MilestoneTypical waitExample: poured Sat, Oct 3
Forms off (keep it braced)24–48 hoursSun, Oct 4 – Mon, Oct 5
Backfill or loads (as your plans allow)7 daysSat, Oct 10
Full design strength28 daysSat, Oct 31

Methodology & assumptions

Volume is calculated as wall length × height × (thickness in inches ÷ 12), then divided by 27 to convert cubic feet to cubic yards. A waste percentage is added for spillage and form leakage, and the result is divided by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and rounded up to the next whole bag. Most wall pours quickly exceed 1 cubic yard, at which point ready-mix delivery is usually more economical and far less labor than bags. The curing timeline under the calculator uses typical published waits, cited below; they vary with the mix, temperature and curing.

  • Manufacturer bag-yield specs (80 lb ≈ 0.60 cu ft)
  • Typical US ready-mix and bag price ranges, 2026
  • American Concrete Institute, ACI 308R guide to curing concrete: keep concrete moist for at least the first 7 days (ordinary portland cement mixes)
  • Portland Cement Association, Design and Control of Concrete Mixtures: moisture and temperature drive strength gain, which slows in cold weather; design strength is commonly specified at 28 days
  • Concrete Network, How Long Before You Can Drive on New Concrete?

How to calculate how much concrete you need for a wall

  1. Measure the wall length and height. Measure the wall length and height in feet. Enter length as "Wall length" and height as "Wall height."
  2. Set the wall thickness. Enter the wall thickness in inches — common residential wall thicknesses run 6-12 in depending on the wall’s purpose and local code.
  3. Choose a waste percentage. Pick 10% standard waste to cover spillage and form leakage, or 5% minimal waste if you are confident in your dimensions.
  4. Divide by bag coverage and round up. Divide the total volume (with waste) by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and round up — or switch to ready-mix once you are above roughly 1 cu yd, which most wall pours exceed quickly.

Worked examples

ProjectResult
10 ft long × 4 ft tall wall, 8 in thick, standard waste0.99 cu yd + 10% waste ≈ 1.09 cu yd → 49 bags
20 ft long × 8 ft tall foundation wall, 8 in thick, standard waste3.95 cu yd + 10% waste ≈ 4.35 cu yd → 196 bags (ready-mix strongly recommended)
6 ft long × 3 ft tall garden wall, 6 in thick, minimal waste0.33 cu yd + 5% waste ≈ 0.35 cu yd → 16 bags

Frequently asked questions

How many bags of concrete do I need for a wall?
Multiply the wall length by its height in feet, multiply by the wall thickness (converted from inches to feet), and divide by 27 to get cubic yards. Add 10% for waste, then divide by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and round up.
How do I measure a wall for this calculator?
Enter the wall LENGTH and wall HEIGHT as the two dimensions (not floor length and width), then set "Thickness" to the wall’s thickness in inches. The calculator multiplies length × height × thickness to get the total concrete volume, the same way it multiplies length × width × depth for a footing.
Does bag size (40 lb, 60 lb, or 80 lb) change how many bags I need?
Yes. A 40 lb bag yields about 0.011 cu yd, a 60 lb bag about 0.0167 cu yd, and an 80 lb bag about 0.0222 cu yd. This calculator assumes 80 lb bags; if you are buying 40 lb or 60 lb bags, divide the cubic yardage by that bag’s yield instead to get an accurate bag count.
Should I use ready-mix for a wall pour?
Almost always for anything beyond a small garden wall. A single 8 ft tall, 20 ft long, 8 in thick foundation wall section is already around 4 cu yd — roughly 200 bags of mix — which is impractical to hand-mix. Once you are above about 1 cu yd, a ready-mix truck or mini-mix delivery is faster and usually cheaper per yard.
Do I need rebar or forms for a concrete wall?
Yes — poured concrete walls are almost always reinforced with rebar and require formwork on both faces to hold the wet concrete in shape while it cures. This calculator estimates concrete volume only; rebar sizing and form design should follow your local code or an engineer’s plan.
When can I take the forms off?
For a wall: forms typically come off after 24 to 48 hours in mild weather (Sun, Oct 4 – Mon, Oct 5 for a Sat, Oct 3 pour), once the concrete holds its shape and the edges no longer crumble; leave them on longer in cold weather. Keep a new wall braced, and put loads or backfill against it only as your plans or inspector allow, usually not before about 7 days. Full design strength comes at about 28 days.
How long does concrete take to cure?
For a wall: concrete sets in hours but keeps curing, gaining strength, for weeks. Typical planning figures: 24–48 hours for forms off, about 7 days before normal use or loads, and full design strength at 28 days. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5, Sat, Oct 10 and Sat, Oct 31; it keeps hardening slowly after that. Keep it moist for at least the first 7 days (mist it, or cover it with plastic or a curing compound) and protect it from freezing: moisture and warmth are what let it reach its strength. Below about 50 °F (10 °C) curing slows, so plan on more days.