Concrete Driveway Calculator

To pour a 9 × 18 ft single-car driveway at 5 inches thick you need about 2.5 cubic yards of concrete plus 5% waste — roughly 119 bags of 80 lb mix, though ready-mix delivery is almost always cheaper at driveway scale.

Figures based on the sources listed belowUpdated How we calculate

Waste allowance

Buy 119 bags.

Buy 119 bags

2.50 cu yd + 5% waste = 2.63 cu yd

Low

$535.50

Expected

$714.00

High

$952.00

Includes 0.13 cu yd waste

How this number is calculated

2.50 cu yd + 5% waste = 2.63 cu yd ÷ 0.0222 cu yd per bag = 119 bags

Next step in your project

  • Gravel Calculator

    A compacted gravel base under the driveway. Opens with your 9 × 18 ft filled in.

2.6 cu yd — ~26% of a standard truck load

2.6 cu yd — ~26% of a standard truck load

Bagged vs. Ready-mix delivery

Bagged (80 lb bags)

119 bags

$535.50–$952.00 (typ. $714.00)

Ready-mix delivery

2.6 cu yd

$367.50–$525.00 (typ. $433.13)

For ~2.6 cu yd, ready-mix delivery is usually cheaper and far less labor.

When can I walk / drive on it?

Pick the day you pour to see the dates.
  1. Forms off, light foot traffic24–48 hours
  2. Normal foot traffic7 days
  3. Cars and pickups7–10 days
  4. Heavy vehicles (RVs, trucks), full design strength28 days

Typical waits for ordinary concrete mix kept moist and above 50 °F (10 °C). They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Follow the bag or your supplier.

Shopping list

  • 80 lb concrete mix
  • Mixing tub
  • Finishing trowel
  • Rebar or wire mesh reinforcement
  • Concrete sealer
  • Concrete edger
Show diagram

Saved projects

No saved projects yet.

Concrete curing timeline

Typical waits after pouring ordinary concrete mix kept moist and above 50 °F (10 °C), counted in calendar days from the pour day. They vary with the mix, temperature and curing: cold weather adds days, and fast-setting mixes shorten some waits. Enter your pour date in the calculator for your own dates.
MilestoneTypical waitExample: poured Sat, Oct 3
Forms off, light foot traffic24–48 hoursSun, Oct 4 – Mon, Oct 5
Normal foot traffic7 daysSat, Oct 10
Cars and pickups7–10 daysSat, Oct 10 – Tue, Oct 13
Heavy vehicles (RVs, trucks), full design strength28 daysSat, Oct 31

Methodology & assumptions

Volume is calculated as driveway length × width × (thickness in inches ÷ 12), then divided by 27 to convert cubic feet to cubic yards. A waste percentage is added for spillage and uneven subgrade, and the result is divided by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and rounded up to the next whole bag. Driveways almost always exceed 1 cubic yard, so ready-mix delivery is usually the more economical and practical choice over bagged mix. The curing timeline under the calculator uses typical published waits, cited below; they vary with the mix, temperature and curing.

  • Manufacturer bag-yield specs (80 lb ≈ 0.60 cu ft)
  • Typical US ready-mix and bag price ranges, 2026
  • American Concrete Institute, ACI 308R guide to curing concrete: keep concrete moist for at least the first 7 days (ordinary portland cement mixes)
  • Portland Cement Association, Design and Control of Concrete Mixtures: moisture and temperature drive strength gain, which slows in cold weather; design strength is commonly specified at 28 days
  • Concrete Network, How Long Before You Can Drive on New Concrete?

How to calculate how much concrete you need for a driveway

  1. Measure your driveway area. Measure the length and width of the driveway in feet to find its footprint.
  2. Set the slab thickness. Enter the slab thickness in inches — 4-6 inches is the standard range, thicker if trucks or trailers will use it.
  3. Add waste. Add 10% for a standard pour, or 5% if you are confident in your forms and mix estimate.
  4. Divide by bag coverage and round up. Divide the total volume (with waste) by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and round up to the next whole bag.
  5. Compare to ready-mix delivery. Above roughly 1 cubic yard — which most driveways exceed by a wide margin — get a ready-mix delivery quote and compare it to the bagged-concrete cost and labor.

Worked examples

ProjectResult
9 × 18 ft single-car driveway, 5 in thick, minimal waste2.50 cu yd + 5% waste ≈ 2.63 cu yd → 119 bags
10 × 20 ft driveway, 5 in thick, standard waste3.09 cu yd + 10% waste ≈ 3.40 cu yd → 153 bags
12 × 24 ft two-car driveway, 5 in thick, standard waste4.44 cu yd + 10% waste ≈ 4.89 cu yd → 221 bags

Frequently asked questions

How much concrete do I need for a driveway?
Multiply the driveway length by width in feet, multiply by the thickness in feet (inches divided by 12), then divide by 27 to convert cubic feet to cubic yards. Add 10% for waste, then divide by the coverage per bag (about 0.0222 cu yd for an 80 lb bag) and round up.
How thick should a concrete driveway be?
Most residential driveways run 4-6 inches thick. Use 4 inches for a car-only driveway on stable soil, and 5-6 inches (this calculator defaults to 5) if the driveway will also see trucks, RVs, or trailers — thicker concrete resists cracking under heavier, repeated loads.
Do I need rebar or wire mesh in a driveway?
Yes — driveways carry vehicle loads, so reinforcement is standard practice even though it does not change the concrete volume this calculator estimates. Rebar (typically a grid on 18-24 in. centers) or welded wire mesh both work; rebar is generally preferred for thicker slabs and areas with poor soil or a lot of freeze-thaw cycling.
Is bagged concrete practical for a driveway?
Rarely. Even a small single-car driveway typically needs 2+ cubic yards, which is 90+ bags of 80 lb mix — mixed and placed by hand before the concrete starts to set. For anything beyond a short apron or patch, ready-mix delivered by truck is almost always cheaper and far less labor.
Should I round up or down when figuring out how much concrete to order?
Always round up. Running short mid-pour is a serious problem with concrete since it starts setting once mixed, and a driveway is a large, highly visible surface where a cold joint from a delayed second batch or truck is hard to hide.
How long before you can walk on concrete?
For a driveway: typically 24 to 48 hours for light foot traffic, once the surface is hard enough not to scuff; edge forms usually come off around the same time. Wait about 7 days before normal traffic, furniture or a loaded wheelbarrow. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5 for light foot traffic and Sat, Oct 10 for normal use. These are typical figures for ordinary concrete mix kept moist and above 50 °F (10 °C); cold weather slows curing and adds days, so follow the bag or your supplier.
How long before you can drive on a new driveway?
For a driveway: typically 7 to 10 days for cars and pickups, and about 28 days for heavy vehicles such as an RV, a delivery truck or a loaded dumpster. Concrete is commonly around 70% of its design strength after 7 days and reaches it at about 28 days, the age design strength is specified at. Keep wheels off the edges, which are weakest, and add days in cold weather (below about 50 °F or 10 °C). Poured on Sat, Oct 3? Cars: Sat, Oct 10 – Tue, Oct 13; heavy vehicles: Sat, Oct 31.
How long does concrete take to cure?
For a driveway: concrete sets in hours but keeps curing, gaining strength, for weeks. Typical planning figures: 24–48 hours for light foot traffic, about 7 days before normal use or loads, and full design strength at 28 days. Poured on Sat, Oct 3, that is Sun, Oct 4 – Mon, Oct 5, Sat, Oct 10 and Sat, Oct 31; it keeps hardening slowly after that. Keep it moist for at least the first 7 days (mist it, or cover it with plastic or a curing compound) and protect it from freezing: moisture and warmth are what let it reach its strength. Below about 50 °F (10 °C) curing slows, so plan on more days.

Related calculators