Deck Footing Calculator: Footing Size, Count and Concrete
A 16 ft long deck with a 10 ft joist span, one beam on posts 8 ft apart, carrying 40 psf live load plus 10 psf dead load on clay or silt soil (1,500 psf presumptive bearing), needs 16 in round footings. Each post carries a 40 sq ft tributary area (half the joist span times the post spacing), which at 50 psf is 2,000 lb. That load divided by 1,500 psf is 1.33 sq ft of bearing, a 15.6 in circle, rounded up to 16 in. The beam has 3 posts, so 3 footings, 0.93 cu ft of concrete each at 8 in thick: 2.8 cu ft, or 6 bags of 80 lb mix with 10% extra. Every footing goes below the local frost line. This checks bearing pressure only: compare the result with the footing table in your adopted code (IRC Table R507.3.1), and your building department governs.
Figures based on the sources listed belowUpdated How we calculate
16 in.
16 in
- Round footing diameter to dig (rounded up): 16 in
- Minimum diameter (exact): 15.64 in
- Tube form to use (standard sizes): 16 in
- Tributary area of the most loaded footing: 40 sq ft, the outer beam: half a span, plus any cantilever
- Load per footing (50 psf): 2,000 lb
- Bearing area needed on 1,500 psf soil: 1.33 sq ft (192 sq in)
- Footings (1 beam × 3 posts): 3 footings, all the size above, sized for the worst one
- Concrete per footing: 0.93 cu ft
- Concrete for 3 footings (no waste): 2.8 cu ft
- Ready-mix to order (with 10% extra): 0.11 cu yd
- Bags of 80 lb mix (with 10% extra): 6 bags
- The same in each bag size: 80 lb: 6, 60 lb: 7, 40 lb: 11
- Footing thickness: at least the 6 in the code table starts at
- Depth: the bottom of every footing must be below the local frost line (and at least 12 in below grade): ask the building department
Shopping list
- Concrete mix (80 lb)
- Round concrete tube form (Sonotube)
- Earth auger for footing holes
- Post base / standoff bracket
- Mixing tub
- Post level
Your project
- Beam length (along the house) × joist span (house to beam): 16 × 10 ft
- Number of beams (rows of footings): 1
- Post spacing along the beam: 96 in
- Cantilever past the outer beam: 0 in
- Live load: 40 psf
- Dead load: 10 psf
- Soil bearing capacity: Clay, sandy clay, silty clay, clayey silt, silt, sandy silt: 1,500 psf
- Footing shape: Round (dug hole or tube form)
- Concrete thickness per footing: 8 in
- Bag size: 80 lb (0.60 cu ft)
Also pick up
- Concrete mix (80 lb)
- Round concrete tube form (Sonotube)
- Earth auger for footing holes
- Post base / standoff bracket
- Mixing tub
- Post level
Reopen this calculation: /calculators/deck-footing/?s=eyJyb29tIjp7Imxlbmd0aEZ0IjoxNiwid2lkdGhGdCI6MTB9LCJkZWR1Y3Rpb25zIjpbXSwid2FzdGVQY3QiOjAuMSwicGFyYW1zIjp7ImJlYW1zIjoxLCJwb3N0U3BhY2luZ0luIjo5NiwiY2FudGlsZXZlckluIjowLCJsaXZlTG9hZFBzZiI6NDAsImRlYWRMb2FkUHNmIjoxMCwic29pbFBzZiI6MTUwMCwiZm9vdGluZ1NoYXBlIjowLCJ0aGlja25lc3NJbiI6OCwiYmFnTGIiOjgwfX0
Show diagram
Saved projects
No saved projects yet.
Footing size by tributary area and soil
| Tributary area | Load | 1,500 psf soil | 2,000 psf soil | 3,000 psf soil | 4,000 psf soil |
|---|---|---|---|---|---|
| 20 sq ft | 1,000 lb | 12 / 10 in | 10 / 9 in | 8 / 7 in | 7 / 6 in |
| 40 sq ft | 2,000 lb | 16 / 14 in | 14 / 12 in | 12 / 10 in | 10 / 9 in |
| 60 sq ft | 3,000 lb | 20 / 17 in | 17 / 15 in | 14 / 12 in | 12 / 11 in |
| 80 sq ft | 4,000 lb | 23 / 20 in | 20 / 17 in | 16 / 14 in | 14 / 12 in |
| 100 sq ft | 5,000 lb | 25 / 22 in | 22 / 19 in | 18 / 16 in | 16 / 14 in |
| 120 sq ft | 6,000 lb | 28 / 24 in | 24 / 21 in | 20 / 17 in | 17 / 15 in |
Tributary area by joist span and post spacing
| Joist span | Inner, 4 ft posts | Inner, 6 ft posts | Inner, 8 ft posts | Outer, 4 ft posts | Outer, 6 ft posts | Outer, 8 ft posts |
|---|---|---|---|---|---|---|
| 6 ft | 24 sq ft | 36 sq ft | 48 sq ft | 12 sq ft | 18 sq ft | 24 sq ft |
| 8 ft | 32 sq ft | 48 sq ft | 64 sq ft | 16 sq ft | 24 sq ft | 32 sq ft |
| 10 ft | 40 sq ft | 60 sq ft | 80 sq ft | 20 sq ft | 30 sq ft | 40 sq ft |
| 12 ft | 48 sq ft | 72 sq ft | 96 sq ft | 24 sq ft | 36 sq ft | 48 sq ft |
| 14 ft | 56 sq ft | 84 sq ft | 112 sq ft | 28 sq ft | 42 sq ft | 56 sq ft |
Presumptive soil bearing values
| Soil | Bearing capacity |
|---|---|
| Crystalline bedrock | 12,000 psf |
| Sedimentary and foliated rock | 4,000 psf |
| Sandy gravel and gravel (GW, GP) | 3,000 psf |
| Sand, silty sand, clayey sand, silty gravel, clayey gravel (SW, SP, SM, SC, GM, GC) | 2,000 psf |
| Clay, sandy clay, silty clay, clayey silt, silt and sandy silt (CL, ML, MH, CH) | 1,500 psf |
Methodology & assumptions
Tributary area: the part of the deck surface one post carries. Measure half the joist span on each side of the beam, and the whole length of any cantilever past the outermost beam, then multiply by the post spacing. The outer beam of a deck on a ledger therefore carries (span ÷ 2 + cantilever) × spacing, and an inner beam carries span × spacing, because it has half a span on both sides. The calculator assumes the deck is attached to the house on a ledger (the house carries that side), that beams are an equal joist span apart, and sizes every footing for the most loaded one, which is the simple, safe way to build. A freestanding deck needs one more beam row, so add one to the number of beams. The posts at the ends of a beam carry less than the interior ones, and that is ignored on the safe side. Load: tributary area × (live load + dead load). The defaults are the 2021 IRC deck loads, 40 psf live load plus 10 psf dead load; use the ground snow load instead of the live load where it is higher, and add to the dead load for composite decking, a hot tub or a roof. Bearing area: load ÷ soil bearing capacity. The soil values are the presumptive load-bearing values of IRC Table R401.4.1, which the code allows when there is no geotechnical report: 1,500 psf for clay, sandy clay, silty clay, clayey silt, silt and sandy silt; 2,000 psf for sand, silty sand, clayey sand, silty gravel and clayey gravel; 3,000 psf for sandy gravel and gravel; 4,000 psf for sedimentary and foliated rock (crystalline bedrock is 12,000 psf and not offered). A report for the site, or a local rule for weak or fill soil, replaces them. Footing size: a round footing is sqrt(4 × area ÷ π) across, a square one sqrt(area) on a side, both rounded up to the next whole inch, and a tube form is the next standard size (6, 8, 10, 12, 14, 16, 18 or 24 in). Footings: beams × (ceil(beam length ÷ post spacing) + 1). Concrete: the rounded-up footing area × the thickness you enter, per footing and for all of them, plus 10% for spills and uneven holes. Bags use the same yields as the concrete column calculator: Quikrete Concrete Mix (No. 1101), 80, 60 and 40 lb ≈ 0.60, 0.45 and 0.30 cu ft. Round up once for the whole job. Compared with the code table: IRC Table R507.3.1 sizes deck footings by tributary area and soil bearing, and gives a diameter, a side and a plain-concrete thickness for each. It is calculated from the same idea, but deck guides that reproduce it print somewhat larger footings than a bare division (for example about 17 in round for 40 sq ft and about 24 in round for 80 sq ft on 1,500 psf soil, against 15.6 and 22.1 in here). Those are typical figures reproduced by secondary sources; read the numbers off the table in the edition your jurisdiction has adopted, and use the larger of the two. The code table also sets a minimum thickness (6 in at the smallest sizes) that this tool only checks. Depth: the bottom of a footing must be below the local frost line (the value in the code's climatic table, Table R301.2(1)) and at least 12 in below undisturbed ground, under IRC R403.1.4 as R507.3 refers to it. The frost depth is a local number this page cannot know: ask your building department. A shallow footing on frozen ground can heave, which is how posts lift and decks go out of level. What is not covered: the weight of the concrete itself, wind uplift and lateral load, a hot tub, planters or a roof, a deck on a slope or on fill, rebar, post bases and the post and beam sizes. This is a bearing check for a typical residential deck, not an engineered design; some places amend the table.
- International Code Council, 2021 International Residential Code, Section R507.3 Footings and Table R507.3.1 Minimum footing size for decks (by tributary area and allowable soil bearing, with side, diameter and plain concrete thickness); the 2024 edition keeps the table: IRC 2024 Section R507.3.1 Minimum size
- International Code Council, 2021 International Residential Code, Table R401.4.1 Presumptive load-bearing values of foundation materials (as adopted in the Seattle Residential Code 2021, Chapter 4)
- International Code Council, 2021 International Residential Code, Section R403.1.4 Minimum depth (footings below the frost line, at least 12 in below undisturbed ground) and Table R301.2(1) frost depth, the local value set by your jurisdiction
- Deck plan packet, Section R507 Exterior Decks, 2021 International Residential Code (Lakewood Township, NJ): the code text on deck footings and footing depth
- Journal of Light Construction, Deck Foundations (jlconline.com): how to find the tributary area of a footing and multiply by the 40 psf live plus 10 psf dead load
- American Wood Council, Prescriptive Residential Wood Deck Construction Guide (DCA 6, 2015 edition): the footing and framing details the IRC deck section is based on
- Quikrete Concrete Mix (No. 1101) data sheet: 80 lb ≈ 0.60 cu ft, 60 lb ≈ 0.45 cu ft, 40 lb ≈ 0.30 cu ft
- Your local building department: the adopted code edition, the frost depth, the ground snow load, any soil requirements and amendments to the footing table, and the footing inspection before you pour
How to size deck footings
- Find the tributary area of the most loaded post. Half the joist span on each side of the beam (the whole span for an inner beam, half for an outer beam plus any cantilever), times the post spacing.
- Multiply by the load. Tributary area times 50 psf (40 live plus 10 dead), or more for snow, composite decking or a hot tub, gives the pounds on the footing.
- Divide by the soil bearing capacity. Use 1,500 psf for clay or silt, 2,000 for sand, 3,000 for gravel and 4,000 for rock (IRC Table R401.4.1), or your soil report. The result is the bearing area.
- Turn the area into a diameter or a side. A round footing is the square root of 4 times the area divided by pi; a square one is the square root of the area. Round up to a whole inch and compare with IRC Table R507.3.1.
- Count the footings and the concrete. Posts per beam is the beam length divided by the spacing, rounded up, plus one, times the beams. Concrete is the footing area times its thickness, plus 10% extra; set the bottom below the frost line.
Worked examples
| Project | Result |
|---|---|
| 16 ft beam, 10 ft joist span, one beam, posts 8 ft apart, 1,500 psf soil, round footings 8 in thick | 16 in round footings, 3 of them, 6 bags of 80 lb mix |
| The same deck with square footings | 14 in square footings, 3 of them |
| The same deck with a second beam (an inner beam, 80 sq ft per post) | 23 in round footings, 6 of them |
| Two beams on gravel soil (3,000 psf) | 16 in round footings, 6 of them |
| The default deck with a 24 in cantilever past the beam | 19 in round footings, 3 of them |
| 12 × 12 ft freestanding deck, two beams, posts 6 ft apart | 21 in round footings, 6 of them, 18 bags of 80 lb mix |
Frequently asked questions
- How big should a deck footing be?
- It depends on what each post carries and the soil. At 50 psf (40 live + 10 dead), a post with a 40 sq ft tributary area carries 2,000 lb, which on 1,500 psf clay needs 16 in round (15.6 in exactly) or 14 in square. An 80 sq ft post on the same soil needs 23 in round, and on gravel (3,000 psf) 16 in. Then compare with the table in your adopted code, IRC Table R507.3.1, which tends to print somewhat larger footings.
- What is tributary area?
- The part of the deck one footing holds up. For a post on an inner beam it is half the joist span on each side of the beam, which is the joist span, times the post spacing. For a post on the outer beam of a deck attached to the house it is half the span plus any cantilever, times the post spacing. A 10 ft span with posts 8 ft apart is 80 sq ft on an inner beam and 40 sq ft on the outer beam.
- What soil bearing capacity should I use?
- If you have no soil report, the code lets you use the presumptive values in IRC Table R401.4.1: 1,500 psf for clay, silty clay, silt and sandy silt, 2,000 psf for sand and silty or clayey sand and gravel, 3,000 psf for sandy gravel and gravel, and 4,000 psf for sedimentary and foliated rock. Use 1,500 psf when you do not know, which is the safe choice. Soft, organic or fill soil can be weaker; ask the building department, who may want it dug out or tested.
- How deep should deck footings be?
- Below the local frost line, and at least 12 in below undisturbed ground (IRC R403.1.4, which the deck footing section R507.3 refers to). The frost depth is set locally in the code’s climatic table, from a few inches in the south to 4 ft or more in the north, so ask your building department. The depth is separate from the footing’s diameter: a deep hole can be poured as a tube full of concrete, or have a pad at the bottom and a post or pier on top.
- How much concrete does a deck footing take?
- The footing area times its thickness. A 16 in round footing 8 in thick is 0.93 cu ft, so the 3 footings of the default deck are 2.8 cu ft, or 0.11 cu yd with 10% extra: 6 bags of 80 lb mix, 7 of 60 lb, or 11 of 40 lb. If you pour the tube full to the frost depth, enter that depth as the thickness; the concrete grows with it.
- Should I use round or square footings?
- For the same load a round footing of diameter d bears on about 79% of the area of a square one with side d, so the circle is about 13% wider than the square side: 16 in round against 14 in square in the default deck. Round holes are easy with an auger or a tube form, square pads need a form. Either meets the code table as long as the size and thickness do.
- Why do the code table’s footings look bigger than this result?
- This tool divides the load by the soil bearing capacity, which is the physics of the check. The code table adds margin and a minimum thickness, and deck guides that reproduce it print somewhat larger footings, for example about 17 in round for 40 sq ft and 24 in for 80 sq ft on 1,500 psf soil (typical figures; check the printed table). When the two differ, build the larger.
- Does more posts mean smaller footings?
- Yes. Closing the post spacing cuts the tributary area of each. The default deck with posts 4 ft apart instead of 8 ft needs 12 in footings instead of 16 in, but 5 of them instead of 3. A bigger beam with fewer posts is usually cheaper than more holes.
- Do I need bigger footings for snow?
- Where the ground snow load is more than 40 psf, use it instead of the live load, because the table assumes the higher of dead plus live and dead plus snow. At 60 psf instead of 40, the default deck needs 19 in round footings instead of 16 in. Local ground snow loads are in the code’s climatic table, or ask the building department.
Handy tools
- Feet and Inches Calculator: Measured 10' 3 1/2"? It turns tape readings into the decimal feet the length and span fields take.