Skip to main content
ponderloop

Paver Calculator

For a 10 x 10 ft patio laid with standard 12x12 inch pavers in a stack bond pattern, you need 100 sq ft of coverage plus 5% waste — 105 pavers.

Figures based on the sources listed belowUpdated How we calculate

Layout / waste pattern

Sets both the coverage math and the layout preview. Common sizes: 12x12 in (square), 6x9 in (Holland), 4x8 in (brick), 16x16 in. Enter in any unit (in, cm, mm, ft, m).

Sets both the coverage math and the layout preview. Common sizes: 12x12 in (square), 6x9 in (Holland), 4x8 in (brick), 16x16 in. Enter in any unit (in, cm, mm, ft, m).

Buy 105 pavers.

Buy 105 pavers

100 sq ft + 5% waste = 105 sq ft

Low

$78.75

Expected

$183.75

High

$367.50

Includes 5 sq ft waste

How this number is calculated

100 sq ft + 5% waste = 105 sq ft ÷ 1 sq ft per paver = 105 pavers

Next step in your project

Layout preview

Tile layout preview: In the room, before extra: ≈ 100 full tiles, 0 cut pieces

In the room, before extra: ≈ 100 full tiles, 0 cut pieces

Shopping list

  • Concrete patio pavers (12x12 in)
  • Paver edge restraint
  • Polymeric jointing sand
  • Plate compactor
  • Rubber mallet
  • Paver splitter / chisel
Show diagram

Saved projects

No saved projects yet.

Methodology & assumptions

Area is calculated as patio length x width in feet, minus any excluded areas you enter, then a waste percentage is added for cuts and breakage — 5% for stack bond, 8% for running bond, 10% for basketweave, and 15% for herringbone, since diagonal 45-degree cuts waste more material than square ones. Coverage per paver is (paver length in inches x paver width in inches) / 144, computed straight from the paver size fields, and the total area (with waste) is divided by that coverage and rounded up to the next whole paver.

  • Interlocking Concrete Pavement Institute (ICPI) — paver installation and laying-pattern guidelines
  • Manufacturer paver dimension and coverage specifications
  • Typical US retail price range for concrete patio pavers, 2026

How to calculate how many pavers you need

  1. Measure your patio or walkway. Measure the length and width of the area in feet (or convert from meters) to find its overall footprint.
  2. Subtract excluded areas. Subtract the area of any planting beds, steps, or fixed features within the footprint that will not be paved.
  3. Set your paver size. Enter the paver length and width — common sizes are 12x12 in (square), 6x9 in (Holland), 4x8 in (brick), and 16x16 in.
  4. Choose your layout pattern. Pick stack bond, running bond, basketweave, or herringbone — each sets a different waste allowance, from 5% for stack bond up to 15% for herringbone.
  5. Divide by paver coverage and round up. Divide the total area (with waste) by the coverage per paver (paver length x width, in inches, divided by 144) and round up to the next whole paver.

Worked examples

ProjectResult
10 x 10 ft patio, 12x12 in pavers, stack bond100 sq ft + 5% waste = 105 sq ft -> 105 pavers
12 x 14 ft patio, 6x9 in (Holland) pavers, running bond168 sq ft + 8% waste = 181.44 sq ft -> 484 pavers
10 x 20 ft walkway, 4x8 in (brick) pavers, herringbone200 sq ft + 15% waste = 230 sq ft -> 1,035 pavers
14 x 18 ft patio, 16x16 in pavers, basketweave252 sq ft + 10% waste = 277.2 sq ft -> 156 pavers

Frequently asked questions

How many pavers do I need per square foot?
Divide 144 (sq in per sq ft) by your paver's length times width in inches. A 12x12 in. paver covers 1 sq ft, so it takes 1 paver per sq ft. A 6x9 in. (Holland) paver covers 0.375 sq ft, so it takes about 2.7 pavers per sq ft. A 4x8 in. (brick) paver covers 0.22 sq ft, about 4.5 pavers per sq ft. A 16x16 in. paver covers 1.78 sq ft, so it takes about 0.56 pavers per sq ft.
Which paver layout pattern wastes the least material?
Stack bond (straight, no offset) wastes the least — about 5% — since every row lines up and cuts are minimal. Running bond needs about 8% for the half-paver offset cuts at row ends. Basketweave needs about 10% since it alternates paired-block orientations. Herringbone wastes the most, about 15%, because every edge is a 45-degree diagonal cut, and diagonal cuts leave more unusable offcuts than square ones.
Do I need edge restraints for a paver patio or walkway?
Yes. Edge restraint (plastic, metal, or a paver edging kit) locks the outer row of pavers in place — without it, the perimeter pavers migrate outward under foot or vehicle traffic, joints open up, and the base and sand underneath erode out from under them. This calculator estimates pavers only; budget separately for edge restraint equal to your patio or walkway's perimeter.
Do I need to fill the joints between pavers with sand?
Yes. After the pavers are laid, sweep polymeric (or regular) jointing sand into the gaps between them to lock the pavers in place, keep them from shifting, and block weed growth. This is a separate product and step from the compacted bedding sand the pavers sit on — see our paver sand calculator for that layer.
What base do pavers need underneath them?
A compacted crushed-stone base (typically 4 in. for a patio or walkway, deeper for a driveway), topped with about 1 in. of bedding sand that the pavers are set directly into. Skipping the base is the most common cause of paver failure — see our paver base calculator to size that layer.
How many pedestals do I need for pedestal pavers?
One under every corner where pavers meet. A grid of R rows by C columns of pavers needs (R + 1) × (C + 1) pedestals, counting the ones along the edges. Example: a 10 × 10 ft deck in 24 × 24 in pavers is 5 × 5 = 25 pavers on 6 × 6 = 36 pedestals. Very large pavers or heavy loads can need an extra pedestal under each paver's center, so check the pedestal maker's spacing.
How many stepping stones do I need for a path?
Divide the path length by the spacing on center (from the middle of one stone to the middle of the next) and round up. About 24 in on center matches a typical adult stride, so a 20 ft path takes 240 ÷ 24 = 10 stones. Space them closer, about 18–20 in, for children or a shorter step.

Guides

Handy tools

  • Slope Calculator: Patios and walkways need a fall of about 1/4 inch per foot for drainage: turn that into the drop over your run.

Related calculators