A 30 × 24 ft crawl space with 6 piers, the liner run 12 in up the walls and 12 in laps at the seams needs about 1,006 sq ft of liner (720 sq ft of floor, 108 sq ft up the walls, 114 sq ft of pier wraps and 64 sq ft lost to the laps), or 1,107 sq ft with 10% for cuts. That is 1 roll of 12 × 100 ft (1,200 sq ft); with 10 × 100 ft rolls it is 2 rolls. It also needs 108 ft of seam tape (1 roll), 31 pieces of 42 in termination bar and about 216 fasteners at 6 in. The model code (IRC R408.3) asks for a Class I vapor retarder over the exposed earth, joints lapped 6 in and sealed or taped, edges extended at least 6 in up the stem wall and attached and sealed; the 12 in laps used here are a common stricter practice, so check your local code. The roll sizes and the tape and bar sizes are typical, not one maker’s list.

Figures based on the sources listed belowUpdated How we calculate

Waste allowance

How far the liner goes up the foundation wall. The model code (IRC R408.3) sets 6 in as the least; many installers go higher, and some state amendments ask for 12 in. Check your local code.

The lap where two sheets meet. The model code says 6 in, sealed or taped; the DOE weatherization guide and some state codes say 12 in, which is the default here. Use what your code and the liner maker require.
Common crawl space liner rolls are 10, 12 and 20 ft wide by 100 ft. Wider rolls mean fewer seams, but a 20 ft roll is heavy to carry through a crawl space.

Each pier, post or column is wrapped with its own piece sealed to the floor liner. Count the ones standing in the crawl space.

The side of a square pier (a 16 in block pier is typical). For a round column use the diameter, a close estimate.

How far up each pier the wrap goes, usually to the underside of the girder or to the top of the pier.

One masonry fastener per spacing along the perimeter. 6 in matches the pre-drilled holes of one maker’s termination bar; follow the instructions for your bar.

Buy 1 roll.

Buy 1 roll

1,006 sq ft + 10% waste = 1,106.60 sq ft

  • Perimeter (wall length to terminate): 108 ft
  • Floor liner: 720 sq ft
  • Wall run-up: 108 sq ft
  • Pier wraps: 114 sq ft
  • Extra liner used by the seam laps: 64 sq ft
  • Rows and seams: 3 rows of 12 ft wide liner, 2 seams
  • Seam tape (row seams and pier seams): 108 ft
  • Seam tape rolls (typical 3.75 in × 180 ft): 1 roll
  • Termination bar (42 in pieces): 31 pieces
  • Fasteners along the termination bar: 216 fasteners
How this number is calculated

1,006 sq ft + 10% waste = 1,106.60 sq ft ÷ 1,200 sq ft per roll = 1 roll

Shopping list

  • Crawl space vapor barrier (12 × 100 ft, 10 mil)
  • Vapor barrier seam tape
  • Termination bar for vapor barrier
  • Masonry nails or concrete screws
  • Double-sided butyl tape
  • Knee pads and headlamp
  • Utility knife
Show diagram

Saved projects

No saved projects yet.

Liner, rolls, tape and bar by crawl space size

Worked by this calculator with no piers, 12 in up the walls, 12 in laps, 10% waste and 12 × 100 ft rolls (the roll count with 20 × 100 ft rolls is in its own column). Liner is the area before waste; with waste is what the rolls are counted from. Add the pier wraps from the calculator for your piers.
Crawl spacePerimeterLinerWith 10% wasteRolls, 12 × 100 ftRolls, 20 × 100 ftTape rollsBar pieces
20 × 20 ft80 ft502 sq ft553 sq ft11123
25 × 20 ft90 ft617 sq ft679 sq ft11126
30 × 24 ft108 ft892 sq ft982 sq ft11131
40 × 25 ft130 ft1,214 sq ft1,336 sq ft21138
40 × 30 ft140 ft1,424 sq ft1,567 sq ft21140
50 × 30 ft160 ft1,764 sq ft1,941 sq ft21146

Liner thickness: what each mil is typically used for

Typical practice and an estimate, not a code table. The model code requires a Class I vapor retarder, which is a permeance rating, and does not give a thickness; check the liner’s data sheet for its ASTM E1745 class and the local code for any thickness it names.
ThicknessTypical useNotes
6 milLight ground cover, little foot trafficCheapest and easiest to tear or puncture; fine only if its data sheet shows the required rating and nobody will walk or store things on it.
10 milCommon choice for an encapsulated crawl spaceMore puncture resistance for the same handling; a typical starting point for a crawl space that is entered now and then.
12 milCrawl spaces with some traffic, gravel or rough soilHeavier and stiffer; check the 12 × 100 ft roll weight before carrying it in.
20 milReinforced liner for heavy traffic, storage or a full encapsulationOften a reinforced, multi-layer product with a longer warranty; a 20 ft wide roll is very heavy.

Methodology & assumptions

Floor: crawl space length × width. Walls: the perimeter, 2 × (length + width), times the run-up height; corners are not subtracted, because the liner folds into them and the corner fold uses material. Piers: each pier or column is wrapped with its own piece, (4 × pier width + overlap) × (pier height + overlap), sealed to the floor liner; this is this site’s own simple allowance, not a standard, so change the pier fields to suit your piers. Seams: the sheets are laid in rows along the length. One row spans the width plus the run-up on the two long walls, and each row after the first loses one overlap to the lap, so the rows are the span minus one overlap, divided by the roll width minus one overlap, rounded up. The seam length is the number of seams times the row length (length plus the run-up at both ends), and the laps use up the seam length times the overlap in extra liner. The total is the floor, the walls, the pier wraps and the seam laps, before waste. Rolls: the total with waste divided by the roll area (width × 100 ft) and rounded up; this is an area estimate that assumes you reuse the off-cuts, so a layout where a row does not divide into the 100 ft length may need a little more, and a row longer than 100 ft needs an end seam this tool does not count. Waste: 5% for a plain rectangle, 10% with piers and pipes, 15% for an irregular shape; the percentages are estimates. Seam tape: the row seams, plus a vertical seam and a base ring for each pier (pier height plus four times the pier width), in rolls of 3.75 in × 180 ft, the size of one maker’s crawl space tape; buy a little more for the pier bases and patches. Termination bar: the perimeter in 42 in pieces, the length of one maker’s bar, which can be cut to length; the same maker’s bar has nail holes every 6 in, so the fastener count is the perimeter divided by the spacing you pick. A double-sided tape or sealant is applied to the wall behind the bar. Code: the model code text, IRC R408.3 for an unvented crawl space, is quoted in the sources; state and local codes amend it (Oregon, for example, allows 12 in laps where seams are not taped and asks for 12 in up the wall; South Carolina asks for ASTM E1745 Class A). The code tests the liner by its water vapor permeance class, not its thickness in mils, so pick the liner by its data sheet. Metric toggle: lengths in m, area in m². This tool covers the liner and its accessories only; it does not cover a dehumidifier, drainage, insulation or sealing the vents.

How to work out how much crawl space vapor barrier to buy

  1. Measure the crawl space and the piers. Measure the length and width of the floor and count the piers or columns, with their width and height.
  2. Choose the run-up and the overlap. Use at least 6 in up the walls and 6 in laps as the model code (IRC R408.3) says, or the larger figures your local code or the liner maker asks for.
  3. Add the floor, walls, piers and laps. Floor = length × width. Walls = perimeter × run-up. Add a wrap for each pier and the liner the seam laps use up.
  4. Add waste and divide by the roll. Add 5 to 15% for cuts, then divide by the roll area (width × 100 ft) and round up.
  5. Order the tape, bar and fasteners. Seam tape for every seam and pier, termination bar for the whole perimeter, and a fastener every 6 in or as the bar says.

Worked examples

ProjectResult
30 × 24 ft crawl space, 6 piers, 12 in up the walls, 12 in laps, 12 × 100 ft rolls, 10% waste1 roll (1,006 sq ft of liner, 1,107 sq ft with waste), 108 ft of tape
The same crawl space on 10 × 100 ft rolls2 rolls (1,006 sq ft of liner, 2 seams)
20 × 20 ft crawl space, no piers, 5% waste1 roll (502 sq ft of liner, 528 sq ft with waste)
40 × 30 ft crawl space, 12 piers, 6 in up the walls, 12 in laps, 10% waste2 rolls (1,580 sq ft of liner, 1,739 sq ft with waste)
50 × 30 ft crawl space, 15 piers, 20 × 100 ft rolls, 15% waste2 rolls (1,997 sq ft of liner, 2,297 sq ft with waste)

Frequently asked questions

How much vapor barrier do I need for my crawl space?
Floor area + wall run-up + pier wraps + the extra the seam laps use, then waste. For a 30 × 24 ft crawl space with 6 piers, 12 in up the walls and 12 in laps that is 720 + 108 + 114 + 64 = 1,006 sq ft, and 1,107 sq ft with 10% waste, which is 1 roll of 12 × 100 ft.
What does the code say about a crawl space vapor barrier?
The model code, IRC R408.3 for an unvented crawl space, requires exposed earth to be covered with a continuous Class I vapor retarder. Its joints overlap by 6 in and are sealed or taped, and its edges extend at least 6 in up the stem wall and are attached and sealed to the stem wall or insulation. Class I is a permeance rating, not a thickness. States and towns amend this: Oregon, for example, uses 12 in up the wall, and South Carolina asks for ASTM E1745 Class A. Read the edition your building department has adopted.
How much should the seams overlap?
6 in is the model-code lap when the seam is sealed or taped, and the DOE weatherization guide and some state codes use 12 in, which is this calculator’s default; PNNL gives 6 to 12 in. A bigger lap uses more liner: with 6 in laps and 6 in up the walls the 30 × 24 ft crawl space needs 893 sq ft instead of 1,006 sq ft. Tape every seam either way.
Which roll size should I buy: 10, 12 or 20 ft wide?
Wider rolls mean fewer seams and less tape, but they are heavy to move through a crawl space. For the 30 × 24 ft example, 10 × 100 ft rolls give 2 rolls (2 seams), 12 × 100 ft give 1 roll (2 seams) and 20 × 100 ft give 1 roll (1 seam), using 974 sq ft of liner against 1,006. The count is an area estimate that assumes you use the off-cuts, so round up if a roll would be left with an awkward remainder.
What thickness of vapor barrier should I use: 6, 10, 12 or 20 mil?
The code tests the liner by its permeance class (Class I), not its mils, so start from the data sheet. As typical practice and an estimate: 6 mil is the thin, cheap choice that tears easily, 10 mil is the usual crawl space liner, 12 mil adds puncture resistance for rough soil and some traffic, and 20 mil reinforced liner suits heavy traffic or storage and a full encapsulation. Thicker liner is heavier to install and costs more per square foot.
How far up the wall should the liner go?
At least 6 in is the model code and the DOE guide; Stego’s specification says 6 in above the outside grade, and Oregon asks for 12 in. This calculator defaults to 12 in. For the 40 × 30 ft crawl space with 12 piers, 6 in up the walls needs 1,580 sq ft; the run-up adds the perimeter times the height, so a longer run-up costs most on a large crawl space.
How do I wrap piers and columns?
Cut a piece that goes around the pier with a lap and tall enough to reach the floor liner with a lap, tape its vertical seam and seal its base to the floor liner. This tool allows (4 × pier width + overlap) × (pier height + overlap) per pier, an estimate: 114 sq ft for the 6 piers (16 in wide, 24 in high) in the default example. Seal columns, pipes and other penetrations with tape or sealant too.
How much seam tape do I need?
Tape every seam, the pier seams and the pier bases. For the default example that is the 2 row seams (64 ft) plus 6 piers, 108 ft in all, one 3.75 in × 180 ft roll. A seam is taped along its full length, so the tape length equals the seam length. Buy an extra roll if you expect patches.
How much termination bar and how many fasteners?
Along the whole perimeter: 108 ft for the 30 × 24 ft crawl space, which is 31 pieces of 42 in bar, the length one maker sells (bar can be cut to size). Its holes are 6 in apart, so about 216 masonry fasteners; at 12 in spacing it would be 108. Put double-sided tape or sealant behind the bar and follow the bar’s instructions.
How much liner for a small or a large crawl space?
A plain 20 × 20 ft crawl space with no piers and 5% waste needs 502 sq ft of liner (528 sq ft with waste), 1 roll of 12 × 100 ft. A 50 × 30 ft crawl space with 15 piers and 15% waste on 20 × 100 ft rolls needs 1,997 sq ft (2,297 sq ft with waste), 2 rolls.