Skip to main content
ponderloop

Cement Board Calculator: Sheets, Screws, Tape and Thinset

Sheets of cement board = floor or wall area × 1.10 ÷ the area of one sheet (15 sq ft for 3 × 5, 32 for 4 × 8), rounded up. A 10 × 12 ft floor is 120 sq ft, 132 sq ft with 10% waste: 9 sheets of 3 × 5 ft board (5 of 4 × 8). Fastening it at 8 in on center takes about 270 screws, seaming it about 64 ft of 2 in alkali-resistant mesh tape (2 rolls of 50 ft), and bedding it in thinset about 2 bags of 50 lb. Use 1/4 in board on floors and 1/2 in on walls. The screw and tape counts are estimates.

Figures based on the sources listed belowUpdated How we calculate

Waste allowance
Sets the board thickness, the screw pattern and whether the board is bedded in thinset. Floors take 1/4 in board, walls 1/2 in.
3 × 5 ft sheets are easy to carry and cut in a bathroom; 4 × 8 ft sheets mean fewer seams to tape on a big floor.

Buy 9 sheets.

Buy 9 sheets

120 sq ft + 10% waste = 132 sq ft

  • Backer board screws: 270 screws
  • Alkali-resistant mesh tape, 2 in (50 ft rolls): 2 rolls (≈ 64 ft)
  • Thinset under the board (50 lb bags): 2 bags

Low

$99.00

Expected

$135.00

High

$189.00

Includes 12 sq ft waste

How this number is calculated

120 sq ft + 10% waste = 132 sq ft ÷ 15 sq ft per sheet = 9 sheets

Next step in your project

Shopping list

  • Cement board screws (1-1/4 in)
  • Alkali-resistant mesh tape (2 in)
  • Modified thinset mortar (50 lb bag)
  • Notched trowel (1/4 inch square-notch)
  • Carbide-tip scoring knife for cement board
  • Cement board shears or cutter
  • Dust mask (N95)
  • Safety glasses
Show diagram

Saved projects

No saved projects yet.

How much cement board for a tile floor

Worked by this calculator: 1/4 in board, no openings subtracted, 10% waste, rounded up to whole sheets, with the 50 lb bags of thinset to bed it.
FloorArea (sq ft)3 × 5 sheets4 × 8 sheetsThinset under the board (50 lb bags)
Half bath, 5 × 6 ft30321
Bathroom, 5 × 8 ft40321
Bathroom, 8 × 10 ft80631
Kitchen, 10 × 12 ft120952
Kitchen, 12 × 15 ft1801473
Great room, 20 × 20 ft40030145

How much cement board for shower and tub walls

Worked by this calculator: 1/2 in board, no openings subtracted, 10% waste, rounded up to whole sheets. Subtract a niche, window or door for a closer count.
WallsWall area (sq ft)3 × 5 sheets4 × 8 sheets
Tub surround, 5 ft tub (10 ft of wall, 7 ft tall)7063
Walk-in shower, 3 × 4 ft stall (11 ft of wall, 8 ft tall)8874
Large shower, 4 × 6 ft (16 ft of wall, 8 ft tall)128105
Full bathroom walls, 8 × 10 ft (36 ft of wall, 4 ft wainscot)144115

Screws and seam tape per sheet (estimates)

Fasteners 8 in on center per USG and James Hardie: a grid across a floor, along each stud on walls. Seam tape is the estimated joint length per sheet when the board covers a large area.
SheetScrews, floorScrews, wall, studs 16 inScrews, wall, studs 24 inSeam tape per sheet
3 × 5 ft (15 sq ft)3417118 ft
4 × 8 ft (32 sq ft)72362412 ft

Methodology & assumptions

The area is length × width in feet, or total wall length × wall height for walls, minus any doors, windows or niches you add. It is multiplied by 1 plus the waste allowance (10%, or 15% for a tub surround, niches or a small floor with many cuts) and divided by the area of one sheet, 15 sq ft for 3 × 5 ft or 32 sq ft for 4 × 8 ft, rounded up to whole sheets. Board thickness is a choice, not a calculation: James Hardie recommends 1/4 in HardieBacker for floors unless 1/2 in is needed to meet a transition, and USG says its 1/4 in Durock is for floors and counters only, so walls take 1/2 in. Screws follow the 8 in on center spacing that both USG (Durock) and James Hardie (HardieBacker) specify for fasteners. On walls they go 8 in apart along each stud, which is 1.125 per sq ft with studs 16 in on center and 0.75 at 24 in. On a floor they go on an 8 in grid over the whole sheet, 2.25 per sq ft. Both are counted on the net area and are estimates: the real count depends on where the framing falls and on how you cut. Seam tape is the length of the joints, estimated as the area × (1 ÷ sheet width + 1 ÷ sheet length) in feet, which is 0.53 ft per sq ft for 3 × 5 and 0.38 for 4 × 8; it runs a little high because it also counts the outer edges, which covers inside corners and the joints against the tub. It is counted in 50 ft rolls of 2 in tape. On floors, thinset under the board is the area with waste ÷ 95 sq ft per 50 lb bag, the same coverage as the thinset calculator (a 1/4 in square-notch trowel; manufacturers list 85 to 95 sq ft), rounded up. Walls have none: the board is screwed to the studs. This is the mortar under the board only. The thinset you use to set the tile, and to fill the seams, is extra: use the thinset calculator for it. Lengths show in m under the metric toggle; sheet sizes stay in feet as sold in the US.

How to calculate how much cement board you need

  1. Pick floor or walls. Choose whether the board goes on a floor (1/4 in, bedded in thinset) or on shower or tub walls (1/2 in, screwed to the studs).
  2. Enter the size. For a floor, enter the length and width. For walls, enter the total length of the walls to be tiled and their height, and add each door, window or niche as an opening.
  3. Choose a sheet size and waste. Pick 3 × 5 ft or 4 × 8 ft sheets and 10% waste, or 15% for many cuts.
  4. Round up to whole sheets. Divide the area with waste by 15 or 32 sq ft per sheet and round up.
  5. Add the fasteners, tape and thinset. Buy screws for fasteners 8 in on center, 2 in alkali-resistant mesh tape for the joints, and, on a floor, thinset for the bed under the board.

Worked examples

ProjectResult
10 × 12 ft floor, 3 × 5 sheets120 sq ft + 10% waste ≈ 132 sq ft → 9 sheets
5 × 8 ft bathroom floor, 3 × 5 sheets40 sq ft + 10% waste ≈ 44 sq ft → 3 sheets
12 × 15 ft kitchen floor, 4 × 8 sheets180 sq ft + 10% waste ≈ 198 sq ft → 7 sheets
Tub surround: 10 ft of wall, 7 ft tall, minus a 3 × 3 ft window, 1/2 in board, 15% waste61 sq ft + 15% waste ≈ 70.15 sq ft → 5 sheets

Frequently asked questions

How many sheets of cement board do I need?
Find the area to be tiled: length × width for a floor, or total wall length × height for walls, minus large openings. Multiply by 1.10 for waste and divide by the area of one sheet (15 sq ft for 3 × 5 ft, 32 sq ft for 4 × 8 ft). Round up. A 10 × 12 ft floor is 132 sq ft with waste, which is 9 sheets of 3 × 5 or 5 of 4 × 8.
How many screws per sheet of cement board?
Both USG and James Hardie call for fasteners at 8 in on center. On a floor, where the board is fastened over the whole surface, that is a grid of about 34 screws per 3 × 5 sheet and 72 per 4 × 8 sheet. On walls the screws go every 8 in along each stud: about 17 per 3 × 5 sheet and 36 per 4 × 8 with studs 16 in on center. These are estimates from the spacing; the exact count depends on the framing and how the sheet is cut. Keep screws 3/8 in from the edges and 2 in from the corners, and use corrosion-resistant backer board screws, about 1-1/4 in long.
How much cement board tape do I need?
Every joint between sheets gets 2 in wide alkali-resistant mesh tape embedded in mortar. As an estimate that is about 8 ft per 3 × 5 sheet and 12 ft per 4 × 8 sheet on a big area (the figure runs a little high, which covers inside corners). The 10 × 12 ft floor needs about 64 ft: 2 rolls of 50 ft. Do not use paper drywall tape: it is not alkali-resistant, and cement board is.
Do I need thinset under cement board on a floor?
Yes. USG and James Hardie both bed floor board in mortar with a 1/4 in square-notch trowel before screwing it down, so the board has full contact with the subfloor and does not flex. About 95 sq ft per 50 lb bag is typical (manufacturers list 85 to 95), so the 10 × 12 ft floor needs about 2 bags. This is separate from the thinset that sets the tile on top. Walls are screwed to the studs with no mortar behind the board.
What thickness of cement board for a floor and for walls?
James Hardie recommends 1/4 in HardieBacker for floors unless you need 1/2 in to meet a transition, and USG says its 1/4 in Durock is for floors and countertops, not walls or ceilings. Walls take 1/2 in board. USG prefers 1/2 or 5/8 in over 1/4 in on plywood, because screws can poke through a thin board, and it asks for a 5/8 in or thicker plywood or OSB subfloor. Check the board maker’s guide for your subfloor.
Should I buy 3 × 5 or 4 × 8 sheets?
3 × 5 ft sheets weigh about 28 lb in 1/4 in, are easy to carry into a bathroom and waste less on small rooms. 4 × 8 ft sheets mean fewer joints to tape on a big floor or tall walls. The 10 × 12 ft floor takes 9 sheets of 3 × 5 or 5 of 4 × 8. Stagger the joints, and keep them off the joints in the subfloor.
Is cement board waterproof?
It is water-resistant and will not rot, but it is not waterproof: water passes through it. In a shower, a waterproofing membrane over the board, or a membrane behind it, is usually needed (James Hardie advises a membrane where code requires one). Cement board is a stable surface for tile, not a waterproofing layer.
How much extra cement board should I buy?
Add about 10% for a plain floor or wall, and about 15% for a tub surround, niches, a small floor with many cuts, or an awkward shape. Leave about 1/8 in between sheets and about 1/4 in at the walls, the tub and the floor, as the manufacturers advise, and cut with a scoring knife and a snap, or shears, wearing a mask: the dust has silica.

Related calculators