Skip to main content
ponderloop

Shower Pan Mortar Calculator: How Many Bags of Deck Mud?

Shower pan mortar = floor area × the average thickness of the sloped bed × 1.10 for waste, divided by what a bag makes. A 36 × 60 in (3 × 5 ft) shower with a centre drain, a pre-slope 3/4 in thick at the drain, 1/4 in per ft of slope and a 1-1/2 in top bed averages 2.67 in thick: 3.7 cu ft of mud with waste, which is 6 bags of 80 lb Quikrete Floor Mud (0.66 cu ft each). With one sloped bed under a bonded membrane it is 3 bags, and with a linear drain along the long wall instead of a centre drain, a traditional pan takes 6. The pan type changes the answer far more than the drain position does.

Figures based on the sources listed belowUpdated How we calculate

Waste allowance
A centre drain needs all four sides to slope to it; a linear drain along a wall needs one plane that slopes across the width from the drain wall. Which takes more mud depends on the shape of the floor.
A traditional pan has a sloped mortar pre-slope under the liner and a second bed of even thickness over it. A bonded system (a sheet or liquid membrane on the mud) needs only one sloped bed.
Bagged mud is counted in bags of that size. For a site mix the count is 94 lb bags of Portland cement; the sand to buy is shown below.
The thinnest point of the sloped bed, at the drain. 3/4 in is the usual minimum for a bonded bed; check the drain maker’s and your membrane maker’s instructions.
The even-thickness bed over the liner. ANSI A108.1A is usually quoted at 1-1/2 in minimum; some details allow 1-1/4 in at a clamping-ring drain.
1/4 in per ft is the usual minimum for a shower floor. A steeper slope takes more mud and is harder to stand on.

Buy 6 bags.

Buy 6 bags

15 sq ft + 10% waste = 16.50 sq ft

  • Mud to mix (with waste): 3.67 cu ft
  • Thickness at the drain: 2.25 in
  • Thickness at the walls: 2.88 in
  • One 80 lb bag fills: 3 sq ft (0.28 m²) at this average thickness, 0.66 cu ft of mud

Low

$54.00

Expected

$72.00

High

$102.00

Includes 1.50 sq ft waste

How this number is calculated

15 sq ft + 10% waste = 16.50 sq ft ÷ 2.97 sq ft per bag = 6 bags

Next step in your project

  • Thinset Mortar Calculator

    Thinset to set the shower floor tile over the cured mud bed. Opens with your 36 × 60 in filled in.

  • Tile Calculator

    Tile for the shower floor and walls. Opens with your 36 × 60 in filled in.

Shopping list

  • Floor mud or deck mud (80 lb bag)
  • Portland cement (94 lb bag)
  • PVC shower pan liner
  • Screed bar (aluminum)
  • Wood float for packing mud
  • Mixing tub
  • Mixing paddle (drill attachment)
Show diagram

Saved projects

No saved projects yet.

Bags of floor mud by shower size

Worked by this calculator: Quikrete Floor Mud 80 lb bags (0.66 cu ft), 3/4 in at the drain, 1/4 in per ft of slope, a 1-1/2 in top bed for the traditional pan, 10% waste, rounded up to whole bags. A linear drain runs along the longer wall.
Shower floorCentre drain, one sloped bedLinear drain, one sloped bedCentre drain, traditional panLinear drain, traditional pan
36 × 36 in (3 × 3 ft)2244
36 × 48 in (3 × 4 ft)2255
36 × 60 in (3 × 5 ft)3366
48 × 48 in (4 × 4 ft)3367
48 × 72 in (4 × 6 ft)551010

What one bag fills by average thickness

Sq ft one bag fills at an average bed thickness of 1, 1.5, 2 and 2.5 in. Yields are the maker’s data sheet figures for bagged mud; the two site mixes are estimates per 94 lb bag of cement.
MudMud per bag (cu ft)At 1 in (sq ft)At 1.5 in (sq ft)At 2 in (sq ft)At 2.5 in (sq ft)
Quikrete Floor Mud, 80 lb bag (0.66 cu ft)0.667.95.343.2
Quikrete Floor Mud, 60 lb bag (0.50 cu ft)0.56432.4
Quikrete Sand/Topping Mix, 80 lb bag (0.66 cu ft)0.667.95.343.2
Quikrete Sand/Topping Mix, 60 lb bag (0.50 cu ft)0.56432.4
Quikrete Deck Mud, 50 lb bag (0.41 cu ft)0.414.93.32.52
Sand and Portland cement, 5 : 1 by volume4.5154.136.127.121.7
Sand and Portland cement, 4 : 1 by volume3.7645.130.122.618

Rise from the drain to the wall by slope

Inches the sloped surface rises between the drain and the highest edge. A centre drain rises over half the longer side; a linear drain over the full width from the drain wall to the far wall.
Longer side or widthCentre drain at 1/4 in per ftCentre drain at 3/8 in per ftCentre drain at 1/2 in per ftLinear drain at 1/4 in per ftLinear drain at 3/8 in per ftLinear drain at 1/2 in per ft
3 ft0.380.560.750.751.131.5
4 ft0.50.75111.52
5 ft0.630.941.251.251.882.5
6 ft0.751.131.51.52.253
8 ft11.52234

Methodology & assumptions

Floor area is length × width, less any bench or area you will not fill, with the waste allowance added (10%, or 15% for an uneven subfloor or hand-packing; both are planning estimates). The mud volume is area × the average (mean) thickness of the bed, which is worked exactly from the drain layout. For a linear drain along one wall the surface is one plane falling across the width W from the drain to the far wall, so the bed runs from the drain thickness t to t + slope × W and averages t + slope × W ÷ 2. For a drain in the centre, four flat facets fall to the drain with one wall height all round; the longest run to a wall (half the longer side) takes the full slope, so the rise is R = slope × longer side ÷ 2, the shorter direction falls a little more steeply, and because the dish left above the surface is a pyramid (one third of the box) the average thickness is t + 2R ÷ 3. A traditional pan is that sloped pre-slope plus a top bed of even thickness poured over the liner; a bonded system is the sloped bed alone. Bags = volume with waste ÷ bag yield, rounded up. Bagged yields are the maker’s: Quikrete lists about 0.66 cu ft for an 80 lb bag and 0.50 cu ft for a 60 lb bag of both Floor Mud and Sand/Topping Mix, and about 0.41 cu ft for a 50 lb bag of Deck Mud, at the recommended mixing water. For a site mix the count is 94 lb bags of Portland cement (1 cu ft each) with sand at 5 : 1 or 4 : 1 by volume; the mud made is the loose volume of the materials divided by 1.33, a common estimating factor for loose-to-mixed volume, so those yields (4.51 and 3.76 cu ft per cement bag) are estimates; damp sand bulks, so measure by volume and test a batch. The minimum thicknesses and the 1/4 in per ft slope are the usual published minimums; the drain maker’s, the membrane maker’s and your local code’s instructions come first, and the TCNA Handbook method you follow sets the real numbers. The drain is assumed to be at the centre of the floor (or on the middle of the wall for a linear drain); an off-centre drain gives one side a longer run to the drain, so it takes more mud.

How to calculate how many bags of shower pan mortar you need

  1. Measure the floor. Measure the finished floor between the curb and the walls, in inches. For a linear drain, the length is along the drain wall and the width is from the drain wall to the far wall.
  2. Pick the drain and the pan. Choose a centre drain or a linear drain along one wall, and a traditional pan (pre-slope, liner and top bed) or a single sloped bed under a bonded membrane.
  3. Set the thickness and slope. Enter the thickness at the drain (3/4 in is the usual minimum for a bonded bed), the top bed thickness for a traditional pan, and the slope: at least 1/4 in per foot.
  4. Choose the mud and the waste. Pick a bagged mud and size, or a sand and cement mix, and a waste allowance of 10% (15% for an uneven subfloor).
  5. Read the bags and the thickness. The calculator works the exact volume of the sloped bed, adds the top bed and waste, divides by the yield of a bag and rounds up. It also shows the thickness at the drain and at the walls so you can set the screed marks.

Worked examples

ProjectResult
36 × 60 in shower, centre drain, traditional pan, Floor Mud 80 lb15 sq ft + 10% waste ≈ 16.5 sq ft, 3.67 cu ft of mud → 6 bags
36 × 36 in shower, centre drain, one sloped bed (bonded membrane), Floor Mud 80 lb9 sq ft + 10% waste ≈ 9.9 sq ft, 0.83 cu ft of mud → 2 bags
48 × 72 in shower, linear drain along the 72 in wall, one sloped bed, Floor Mud 80 lb24 sq ft + 10% waste ≈ 26.4 sq ft, 2.75 cu ft of mud → 5 bags
36 × 60 in shower, centre drain, traditional pan, 5 : 1 sand and cement (bags of cement)15 sq ft + 10% waste ≈ 16.5 sq ft, 3.67 cu ft of mud → 1 bag
48 × 48 in shower, centre drain, traditional pan, 1/2 in per ft slope, 15% waste, Floor Mud 60 lb16 sq ft + 15% waste ≈ 18.4 sq ft, 4.47 cu ft of mud → 9 bags

Frequently asked questions

How many bags of floor mud do I need for a shower pan?
Work out the volume of the sloped bed, add 10% and divide by what a bag makes. A 3 × 5 ft shower with a centre drain, 3/4 in at the drain, 1/4 in per ft of slope and a 1-1/2 in top bed averages 2.67 in thick, which is 3.3 cu ft, or 3.7 cu ft with waste. An 80 lb bag of Quikrete Floor Mud yields about 0.66 cu ft, so that is 6 bags. A single sloped bed under a bonded membrane is 3 bags.
How much does a bag of Quikrete Floor Mud cover?
Quikrete lists about 0.66 cu ft for an 80 lb bag and 0.50 cu ft for a 60 lb bag, with about 4 quarts of water (not more than 5-1/2 quarts) for an 80 lb bag. That is 7.9 sq ft at 1 in thick and 4 sq ft at 2 in. Quikrete Sand/Topping Mix has the same listed yields. Deck Mud in a 50 lb bag yields about 0.41 cu ft.
How thick should the mortar bed be at the drain?
It depends on the method. A bonded sloped bed is commonly given as 3/4 in at its thinnest, at the drain. In a traditional pan, the pre-slope under the liner is often 3/4 in at the drain (some details say 1/2 in), and the top bed over the liner is usually quoted as 1-1/2 in at the minimum (ANSI A108.1A), with 1-1/4 in allowed at the drain by some TCNA details. Follow the drain maker’s and the membrane maker’s instructions and the TCNA method you are using; the calculator lets you set both thicknesses.
What slope does a shower floor need?
At least 1/4 in per ft toward the drain, which is about 2% and is the figure in the International Residential Code for the finished floor of a shower and in the TCNA shower details (B415 shows a pre-pitched bed at 1/4 in per ft). The IRC also caps it at 1/2 in per ft (4%). The calculator offers 1/4, 3/8 and 1/2 in per ft. A steeper slope takes more mud and is harder to stand on. Check the edition of the code your jurisdiction has adopted.
Does a centre drain or a linear drain take more mud?
It depends on the shape of the floor. A centre drain rises over half the longer side; a linear drain rises over the whole distance from the drain wall to the far wall. On a 3 × 5 ft floor at 1/4 in per ft with a linear drain along the long wall, the rise is 0.75 in against 0.625 in for a centre drain, but the centre-drain bed averages 1.17 in against 1.13 in, because a centre drain’s four facets leave a pyramid-shaped dish. On a 4 × 4 ft floor the linear drain rises 1 in against 0.5 in and takes more. The calculator works both exactly.
What is a pre-slope, and why are there two layers?
In a traditional pan the waterproofing liner sits on a mortar pre-slope that falls to the drain, so any water that gets through the tile and top bed runs along the liner to the weep holes of the drain. A second bed of even thickness goes over the liner and carries the tile. The two beds have the same slope, so the top bed is a flat-thickness layer over the pre-slope. A bonded system with a sheet or liquid membrane on the mud needs only one sloped bed.
How do I mix my own deck mud from sand and cement?
The usual dry-pack mix is 4 or 5 parts damp sand to 1 part Portland cement by volume, with only enough water to hold a squeezed handful together. Measure with the same bucket. A 94 lb bag of cement is 1 cu ft. For the default 3 × 5 ft floor at 5 : 1 the calculator gives 1 bag of cement and about 4 cu ft of sand, using an estimated 4.5 cu ft of mud per bag of cement. Damp sand bulks, so the yield varies; make a test batch and keep a spare bag.
How much extra should I buy?
About 10% for waste is the standard allowance, covering mud left in the tub, spills and the floor being a little lower than the plan. Use 15% for an uneven subfloor or if you are packing by hand. Both are planning estimates. Mud stiffens as it sits, so mix in batches and buy a spare bag rather than run short; a cold joint between two days’ batches is a weak spot.

Related calculators